Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a mixed-use development in San Diego, California. Conceptual plans call for the demolition of a stadium; for the construction of a stadium; for site work for a stadium; and for paving for a stadium.
BID VALID 90 Days LIQUIDATED DAMAGES $5,500/day START/DELIVER DATE June 2022 / May 2023 PROJECT DURATIONS 12 Months LICENSE REQUIREMENTS CA contractor's license, DIR registration PAYMENT BOND 100.00% PERFORMANCE BOND 100.00% For Design, Preconstruction Services, and Construction of the SDSU Mission Valley Site Development for San Diego State University. Project Design Consultants (PDC) is the Civil Engineer of Record for the SDSU Mission Valley Site Development project and Schmidt Design Group is the Landscape Architect. This project is a public works project. The proposed Project is located south of Friars Road, west of Interstate 15, north of the San Diego River, and east of the existing Fenton Marketplace shopping center in Mission Valley. The proposed project would include the site development of a Mission Valley campus for SDSU including the infrastructure required for educational, research, technology, and support programs within a mixed-use university village and research park an approximately 45 acre Riverpark along the San Diego River and Murphy Canyon Creek. Also included in this project is demolition of the existing San Diego County Credit Union Stadium, (previously known as "San Diego Stadium," "Jack Murphy Stadium," and "Qualcomm Stadium"); the construction of a new, multipurpose stadium (by others); the installation of temporary facilities and infrastructure for opening day of the multipurpose stadium; the creation of a River Park including passive and active recreation space and parks; and associated infrastructure and amenities and adjacent offsite improvements. Specifically, the proposed project would include site development consisting of grading and infrastructure to accommodate the rough grading and infrastructure for approximately 1.6 million square feet for campus uses; a 35,000 capacity multi-use stadium, approximately 4,600 residential units on 15 blocks; 2 hotels with approximately 400 hotel rooms; approximately 95,000 square feet of commercial/retail uses (by others); the final design and construction of river park as part of approximately 83 acres of open space; offsite improvements to adjacent roadways, landscape, parking, and roadways in select initial phases of the project. Potential traffic improvements include; widening of Friars Road west of Mission Village Drive, portions of Mission Village Drive, modifications to San Diego Mission Rd, and other potential widenings and road connections that are being finalized as part of the CEQA process. Additional Offsite improvements to be constructed in the future. This is a prevailing wage job and will be following DIR requirements. Subcontractors should be registered and current with the State of California at the time of bid. Qualifications will be submitted through Building Connected. Email ethan.eichhorn@clarkconstruction.com for RFQ documents and access to building connected. The method of Contractor Selection has not been determined at this time. As of May 12, 2022, the due date has been confirmed with the owner.
Conceptual
Educational
$1,000,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2022
5500 Campanile Dr, San Diego, CA
Related To This Project
San Diego, CA
Bid Date: Apr 06 2022
San Diego, CA
Bid Date: Apr 25 2022
San Diego, CA
Bid Date: May 11 2022
San Diego, CA
Bid Date: May 13 2022
San Diego, CA
Bid Date: May 13 2022
San Diego, CA
Bid Date: May 13 2022
San Diego, CA
Bid Date: May 12 2022
San Diego, CA
Bid Date: Apr 06 2022
San Diego, CA
Bid Date: Mar 29 2022
San Diego, CA
Bid Date: Mar 17 2022
San Diego, CA
Bid Date: Mar 17 2022
San Diego, CA
Bid Date: Apr 13 2022
San Diego, CA
Bid Date: May 12 2022
San Diego, CA
Bid Date: May 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.