EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 7, 2022 at 8:00 PM

Updated October 1, 2024

Demolition, site work and renovation of a water / sewer project in Canastota, New York. Completed plans call for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

Separate sealed Bids will be received for the following:Contract No. 1 - GeneralContract No. 2 - ElectricalContract No. 3 - HVACBids shall be on a lump sum basis for Contract Nos. 1, 2, and 3.The work consists of constructing, complete with all equipment, accessories, and appurtenances the following in accordance with the plans and specifications heretofore prepared by Timothy P. O'Hara, P.E., PLLC; and Lynstaar Engineering, P.C.: Demolition of the complete existing grit washing and dewatering equipment and all associated controls, appurtenances located in the Screening and Grit Room and in the Electric Room of the Headworks facility, and replacement with a new grit cyclone and classifier assembly, complete with local controls, remote main control panel, and all associated supports, hangers, electrical conduit, wiring and appurtenances. Demolition of all drain pipes, supports, hangers, and appurtenances associated with the above-referenced grit equipment being demolished and of the complete grit slurry feed piping from the submersible grit pump discharge pipe connection (above the grit chamber liquid surface) to the grit dewatering system being demolished, and replacement with new grit slurry feed and drain piping of types, quantities and sizes as required to accommodate the new grit cyclone and classifier assembly. Demolition of existing electrical panels, fixtures and appurtenances in the Screening and Grit Room and replacement with new electrical panels, fixtures and appurtenances, and corresponding electrical modifications and upgrades in the Electric Room, to replace corroded and non-functioning items and to accommodate new equipment systems being provided by the other Prime Contracts. Demolition of the existing heating and ventilating systems in the Screening and Grit Room and replacement with new heating and ventilating systems. Provision of a new flow monitoring system for automatic measuring and recording of pump station bypass and overflow events, to include modifications to the existing concrete vault that receives discharges from the facility's wet weather storage tank overflow pipe (12-inch diameter) and from the pump station influent bypass pip e (24-inch diameter), provision of two (2) new area velocity type flow meters (one provided for each of the above referenced 12-inch and 24-inch pipes), associated flow transmitter and weatherproof enclosure, and all associated electrical conduit, wiring and appurtenances. Demolition and replacement of six (6) NEMA 7 disconnect switches and enclosures, one for each of three dry weather pumps and one for each of three wet weather pumps, mounted outdoors over the corresponding pump wet wells. Demolition and replacement of one (1) NEMA 7 disconnect switch and enclosure for the wet well mixer, mounted outdoors over the dry weather wet well. Arrangements shall be made in advance to examine the documents at the Village Hall located at 205 South Peterboro Street in the Village of Canastota, by contacting the Village Clerk-Treasurer, Catherine Williams, at (315) 697-7559, Monday through Friday, 8:00 a.m.-3:00 p.m. The estimated contract costs are as follows: GC - $200,000 to $260,000 EC - $80,000 to $120,000 HV - $80,000 to $120,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Demolition, Renovation, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Project Meetings, Submittal Procedures, Certificates, Design Data, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Grouting
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Applied Fireproofing, Firestopping
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes, Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Office Furniture, Filing Cabinets, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Pool and Fountain Plumbing Systems
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Identification for Electrical Systems, Commissioning of Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Dewatering, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
58
Bidding Soon
853
All Active Projects
434
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

July 4, 2022

img_map_placeholder

To Be Determined, Canastota, NY

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Headworks Facility Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.