BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Carbonado, Washington. Completed plans call for site work for a road / highway.

Award Details Contract Award Date: Aug 02, 2022 Contract Award Number: 140P8322C0014 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: LFS1Y79ZP9H7 Contractor Awarded Name: JJH EARTHWORKS LLC Contractor Awarded Address: , WA 98155-5311 USA Base and All Options Value (Total Contract Value): $624035 MAGNITUDE OF CONSTRUCTION: In accordance with FAR 36.204 the estimated magnitude of this construction project is between $250,000 and $500,000. Request for Proposals #140P8322R005 is for construction services for stabilizing and mitigating further erosion of the roadway embankment of the damaged Carbon River Road. THIS IS NOT A GOVERNMENT ESTIMATE" In accordance with FAR 36.204 the Magnitude of Construction: between $250,000 and $500,000. This project is subject to Construction Wage Rate Requirements. Site Visit: A site visit is planned for Thursday, May 26, 2022 at 10:00 am PDT. Kindly RSVP to zachary_martin@nps.gov by noon on May 24, 2022. Location: Immediately prior to the Mount Rainier National Park Carbon River Entrance. On the Carbon River Road / Fairfax Forest Reserve Road E less than a quarter mile past the intersection with NF-7810. Lat/Long: 46.99497, -121.91636 Type of Contract: a Firm-Fixed-Price contract will be awarded Set-Aside: This procurement is 100% set-aside for Small Business concerns in accordance with FAR part 19.5. Instructions: To complete this SF1442, write the business name, address, DUNS number, and point of contact in Block 14 and complete Blocks 15 through 20C, including acknowledging all amendments in Block 19. Complete Price Schedule and return with documents listed in Section L. Additional instructions and a list of forms are provided in Section L. Blank price schedule and other required and optional documents are hyperlinked to the solicitation at SAM.gov. Administrative POC: Michael Beatty Contracting Officer PH: 360-854-7219 Email: michael_beatty@nps.gov Delivery: 45 Days After Notice to Procee PROJECT LOCATION: Carbon River Road/Fairfax Forest Reserve Road E approximately a quarter mile past the intersection with NF-7810, Mount Rainier National Park, Longmire WA. Maps and information are at www.nps.gov/MORA. INQUIRIES 1. To ensure questions are adequately addressed, questions must be received no later than SEVEN calendar days prior to the proposal due date shown in the latest amendment. Questions and/or comments received after this time may or may not be addressed prior to the solicitation closing date. Note: Amendment(s) to the solicitation answering any questions relative to these documents will be timely posted at SAM.gov. 2. Send written inquiries to michael_beatty@nps.gov. 3. "Or Equal" product requests: The Government's evaluation of requests to substitute specified products will be made after contract award as part of the submittal review process (reference FAR clause 52.236-5). Site Visit (Construction) (FEB 1995) (a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, the Offeror is urged and expected to inspect the site where the work will be performed. (b) A site visit is planned for Thursday, May 26, 2022 at 10:00 am PDT. (c) Kindly RSVP to zachary_martin@nps.gov by noon on May 24, 2022. (d) Location: Immediately prior to the Mount Rainier National Park Carbon River Entrance. On the Carbon River Road / Fairfax Forest Reserve Road E less than a quarter mile past the intersection with NF-7810. Lat/Long: 46.99497, -121.91636 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$624,035.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
76
Active Projects
28
Bidding Soon
667
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 21, 2022

July 21, 2022

img_map_placeholder

Fairfax Forest Reserve Rd E & Carbon River Rd, Carbonado, WA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.