Site work for a pipeline in Summerville, Georgia. Completed plans call for site work for a pipeline.

Under this project, the Contractor shall furnish all labor, equipment and materials necessary to relocate a gas main in conflict with GDOT improvements as shown in the construction drawings. More specifically, the work shall consist of +-992 LF of 4" steel gas main installation, including a +-600 LF bore under Raccoon Creek and two road bores, 2 service relocations, +-32 SF pavement replacement, erosion & sediment control, grassing and all other appurtenances necessary for a complete installation. Time allotted for completion of work is 105 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. The Work will be awarded in one (1) Contract. The Scope of Work as described herein is defined as "utility contracting" in accordance with O.C.G.A. 43-14-2(17) so the Contractor preforming the work must provide proof of a valid license by the State of Georgia as a "Utility Contractor" and must employ a "Utility Manager" certification holder who will have oversight on all the work. Therefore, the Contractor submitting a bid must list the license number of the Contractor performing the utility contracting on the face of the bid envelope and on the bid form and provide proof of a valid license with the bid. No bid will be opened unless it contains the Contractor's Utility License Number on the envelope. See Instruction to Bidders for additional bidding requirements. Prequalification may be required of Bidders prior to the award of contract. At the Owner's request, detailed written evidence such as financial data, bonding capacity, previous experience, present commitments, and other such data as may be necessary to assist Owner in determining Contractor's qualifications shall be provided per the Instructions to Bidders contained in the contract documents. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability". Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. All anticipated federal, state, or local permits required for the project will be obtained prior to signing of the construction contract. All anticipated rights of way and easements required for the project will be obtained prior to signing of the construction contract. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner. Owner reserves the right to waive informalities, and to readvertise

Award

Pipeline

$199,890.00

Public - City

Site Work

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
117
Active Projects
71
Bidding Soon
1,308
All Active Projects
540
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2022

July 6, 2022

img_map_placeholder

GA-48, Summerville, GA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.