BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a bridge / tunnel in Montgomery, Illinois. Working plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; and for paving for a bridge / tunnel.

Site Directions: Mill Street Bridge in the Village of Montgomery, IL For the construction of Village of Montgomery Mill Street Bridge Improvements and Lighting; which consists of parapet railing removal, parapet railing, protective coat, concrete sealer, cleaning and painting bearings, parapet and precast panel blasting, cleaning and painting, cleaning existing scuppers, bridge washing, expansion joint repair, polymer modified portland cement mortar, polymer concrete, aestethic bridge lighting, traffic control and detour and any other ancillary items A certified check or bank draft, payable to the order of The Village of Montgomery negotiable U.S. Government bond (at par value) or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Bid shall be submitted with each Bid. If you have any questions please contact Chris Ott at 630-466-6757 or cott@eeiweb.com. Attention is called to the fact that not less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, or national origin. The Village of Montgomery reserves the right to reject all Bids or to waive any informalities in the bidding. Bids may be held by The Village of Montgomery for a period not to exceed 60 days from the date of the opening of Bids for the purpose of reviewing the Bids and investigating the qualifications of Bidders, prior to awarding of the Contract. IDOT Certificate of Eligibility will be required. The Village of Montgomery is an equal opportunity employer.

Final Planning

Bridges / Tunnels

$500,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
174
Active Projects
118
Bidding Soon
1,760
All Active Projects
789
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

January 18, 2023

img_map_placeholder

Mill St, Montgomery, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.