BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 15, 2025 at 8:00 PM

Updated September 16, 2025

Site work and new construction of a parking garage in Berkeley, California. Completed plans call for the construction of a 220,000-square-foot, eight-story above grade, 660-space parking garage; and for site work for a parking garage.

*The owner has selected a Construction Manager. A timeline for construction has not yet been established. Bancroft Parking Structure Replacement Bancroft Parking Structure Project. The Bancroft Parking Structure is a new 8-story pre-cast concrete hybrid moment frame structure that will replace an existing parking structure at 2643 Bancroft Way. The new parking structure is approximately 220,000 square feet and will accommodate 660 parking stalls and secured bike storage parking. Structural beams and columns will be pre-cast at the Clark Pacific Precast plant in Woodland, CA while foundations and topping slab will be cast-in place concrete. Foundations are grade beams over an Auger Cast Column Ground Improvement System. The selected Construction Manager will assist the Capital Projects Project Manager in managing/coordinating the remainder of the preconstruction and construction phases of the project. Responsibilities will include all aspects of project delivery including budgeting, design management, value engineering, design review, constructability review, project scheduling, contractor management, coordination with campus stakeholders and facilities services, project quality control, change order review/analysis, submittal reviews, RFI review, meeting notes, etc. The selected Construction Manager shall collaborate closely with the Office of Capital Projects on issues including, but not limited to, university standards, policy compliance, design and environmental review, architect and contractor performance, contract requirements, approval of payments, and representation of the university. Submitting firms should propose a conceptual staffing model and organizational chart for the project, but Capital Projects will determine final staffing and relationships. o Reference Documents: 90% CD Drawings, dated 12/20/24, 290 pages. o Construction Schedule, dated 01/31/25,18 pages. Construction is anticipated to start May 2025 and be completed by August of 2026. Estimated Construction Cost: $43,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Parking Garage

$43,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
448
Active Projects
224
Bidding Soon
3,264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2025

July 15, 2025

Project location map

To Be Determined, Berkeley, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.