Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 3, 2022 at 8:00 PM
Updated October 1, 2024
Renovation of an educational facility in Tuscaloosa, Alabama. Completed plans call for the renovation of a educational facility.
General Contractors; mechanical, electrical, plumbing, fire protection subcontractors are required to prequalify prior to requesting Bid Documents. For information on obtaining plans, specifications, and contract documents go to UAbidinfo.ua.edu or contact Michael Taylor at Pryor Morrow Architects, 205-828-0039. For questions regarding this project, please contact UA Project Manager Shawn Templeton at 205-348-2037 or smtempleton@ua.edu. A. The Project is an infrastructure upgrade of the south wing of the Ruby Tyler Building. Project includes interior work: demolition, wall framing, mechanical rough-ins, electrical rough-ins, and plumbing rough-ins. B. The work shall include all labor, materials, equipment, services, and related activities andprocedures necessary to the complete construction including the buildings, site work, mechanical, plumbing, electrical, and other improvements as shown on the Drawings and required in the Specifications (Project Manual).
Bid Results
Educational
$250,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 04 - Masonry
Division 05 - Metals
Division 06 - Wood, Plastics, and Composites
Division 08 - Openings
Division 09 - Finishes
Division 10 - Specialties
Division 14 - Conveying Equipment
Division 22 - Plumbing
Division 23 - Heating Ventilating and Air Conditioning
Division 28 - Electronic Safety and Security
Division 32 - Exterior Improvements
Division 33 - Utilities
Division 41 - Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2022
August 1, 2022
To Be Determined, Tuscaloosa, AL
Related To This Project
Tuscaloosa, AL
Bid Date: Jun 01 2022
Tuscaloosa, AL
Bid Date: Apr 26 2022
Tuscaloosa, AL
Bid Date: Apr 17 2025
Tuscaloosa, AL
--
Tuscaloosa, AL
--
Tuscaloosa, AL
Bid Date: Apr 21 2022
Tuscaloosa, AL
--
Tuscaloosa, AL
Bid Date: Jun 07 2022
Tuscaloosa, AL
Bid Date: Dec 16 2021
Tuscaloosa, AL
Bid Date: May 05 2022
Tuscaloosa, AL
Bid Date: Apr 12 2022
Tuscaloosa, AL
Bid Date: Apr 12 2022
Tuscaloosa, AL
Bid Date: Mar 29 2022
Tuscaloosa, AL
Bid Date: May 24 2022
Tuscaloosa, AL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.