BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 31, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a bridge / tunnel in Crystal Falls, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Removal of three existing culverts (32 diameter). Excavation for new abutments, construct new concrete abutments, install new timber superstructure and timber decking and wearing surface, backfill structure, install new signs, place gravel approaches, place riprap on the waterward side of the new concrete abutment walls, place erosion control measures and site restoration. 5% Bid Security ACCEPTING QUESTIONS UNTIL: May 4, 2022, 3:00 p.m. EST

Award

Bridges / Tunnels

$159,220.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
27
Bidding Soon
318
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2022

June 10, 2022

Project location map

Deerfoot Lodge Rd, Crystal Falls, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.