EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 10, 2022 at 8:00 PM

Updated October 1, 2024

Remodeling and renovation of a military facility in Mechanicsburg, Pennsylvania. Completed plans call for the remodel of a military facility.

This is a Design-Build (DB) construction project to remove the existing sprinkler system and replace with a new fire sprinkler system to meet current NFPA code and hazard classification in Building 209 at NSA-Mechanicsburg, PA. The project will require all site and survey work, engineering, design, labor, material, equipment and supervision required to remove the existing dry sprinkler system and sprinkler valve room and replace with a new hydraulically designed wet sprinkler system. The sprinkler system removal shall include the OS&Y valves in the sprinkler valve rooms and everything downstream. The sprinkler pipe is coated with lead based paint. The contractor must remove the existing items from sprinkler valve rooms; including, walls, ceiling, doors, heaters, lighting, and electrical circuits back to the panel or closest splice if they are not dedicated. The sprinkler valve room construction includes, but is not limited to, gypsum board, asbestos board, and lumber. The construction must provide bollards around the new sprinkler equipment for protection against damage from forklifts. The contractor must install new and complete wet pipe sprinkler systems in building 209. The new sprinkler system must include coverage in the entire warehouse. The area within the warehouse includes sprinkler valve rooms, restrooms, mechanical room, tank room, maintenance rooms, loading dock, lunch room, offices, and transformer room. There are also eight raised room monitors present. Any exterior canopies, covered areas, or loading docks shall have sprinkler coverage. The building is dividing into four (4) separate fire bays by concrete block fire walls. It will also include connecting the new sprinkler system to any existing fire alarm system in the building. The contractor must provide a pressure reducing valve on any domestic water laterals on the incoming sprinkler riser. Offers good for 60 calendar days. RFI's are due May 3, 2022. General Decision: PA20220085 04/01/2022 and is in the General Documents folder. Site Visit: In accordance with FAR 52.236-27 –Site Visit (Construction) (Feb 1995), an organized site visit is scheduled for April 28 , 2022. Only one site visit will be conducted. MACC contract holders are to supply the names of all attendees (including their subcontractors) they will be sending for the site visit and shall indicate if the attendees have NSA Mechanicsburg DBIDS. This information shall be provided no later than April 27th, 2022 at 11:00 am by sending an email to Doyon. Contractors with NSA Mechanicsburg DBIDs will assemble at the Northwest corner of Building 209 at 10:00 am. Contractors without NSA Mechanicsburg DBIDs will be escorted. Escorted attendees shall meet at the North entrance pass office at 9:30 am with a driver’s license, (and vehicle registration/insurance if driving on base,) for access and escorting. Failure to provide the names of the attendees by the indicated deadline will result in access being denied. Any person that is not on the list for site visit will not be granted access. If there are not sufficient escorts access will be rejected. NSA Mechanicsburg is a secure navy installation. All visitors shall be required to present documentation evidencing personal identification and firm affiliation. Anyone who does not have the necessary identification to enter the base must follow the steps to request access as indicated in the paragraph above. It is your responsibility to confirm that someone will be available to escort you onto the base. *Amendment 1 and 3 have been released.

Post-Bid

Military

$500,000.00

Public - Federal

Remodeling, Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Controls, Temporary Erosion and Sediment Control, Temporary Environmental Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Commissioning
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation, Polychlorinate Biphenyl Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Stone Assemblies
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Membrane Roofing, Modified Bituminous Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Roofing, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Compression Seals
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Windows, Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Portland Cement Plastering, Gypsum Board, Tiling, Ceramic Tiling, Flooring, Wall Finishes, Painting and Coating, Painting, Exterior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Bath Accessories, Exterior Specialties, Exterior Protection
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Projection Screens
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Systems Furniture, Other Furnishings, Site Furnishings
Division 13 - Special Construction

Division 13 - Special Construction

Special Structures, Fabricated Engineered Structures
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Fan Coil Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Off-Gassing Mitigation, Radon Mitigation, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Concrete Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Utility Structures, Water Utilities, Storm Drainage Utilities, Culverts, Electrical Utilities, Site Grounding, Communications Utilities, Communications Structures
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Lifts, Slings
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
86
Bidding Soon
1,389
All Active Projects
595
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2022

June 27, 2022

img_map_placeholder

To Be Determined, Mechanicsburg, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

NAVFAC DB Replace Fire Sprinkler System in B209

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.