BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Springfield, Nebraska. Completed plans call for site work for a water / sewer project.

Hawkins Construction Company of Omaha, Nebraska, on behalf of the Sarpy County and Cities Wastewater Agency (Agency), and acting as the Agency's Construction Manager at Risk, is requesting Proposals for the construction of the following project: Southern Sarpy County Regional Wastewater System - Phase 1A The Project includes the following Work: The proposed project area is generally located between the City of Springfield's Wastewater Treatment Facility (SWWTF) at 17305 S Hwy 50 and extends east to the City of Omaha's Papillion Creek Waste Resource Recovery Facility (PCWRRF) located at 15705 Harlan Lewis Road in Bellevue, Nebraska. This proposal package includes three (3) lift stations: Springfield Lift Station The proposed Springfield Creek Lift Station will be constructed south of the City of Springfield at the existing Springfield Wastewater Treatment Facility (SWWTF) located at 17305 S Hwy 50 and would collect sanitary flows from the Springfield Creek and Buffalo Creek Basins. Flows from the Springfield Creek Basin will be conveyed to the lift station from the proposed Springfield Creek interceptor sewer (not part of this project scope). It is anticipated that the proposed interceptor will eventually include existing flows diverted from the SWWTF, which may be abandoned upon final completion and start-up of the Phase 1A projects. Future flows from the Buffalo Creek Basin will be conveyed to the lift station through a future interceptor sewer or force main. The Springfield Creek Lift Station will pump flows to the wet well of the Mitchell Road Lift Station. Mitchell Road Lift Station. The Mitchell Road Lift Station will be constructed on the north side of Mitchell Road between South 108th Street and South 99th Street. The Mitchell Road Lift Station will collect the discharge from the Springfield Creek Lift Station and pump flow east to the transition structure located in the vicinity of South 36th Street and Platteview Road. The transition structure would include a free discharge and pumped flow will transition to gravity flow. Zweibel Creek Lift Station The Zwiebel Creek Lift Station will be constructed north of Platteview Road along South 63rd Street and would collect sanitary flows from the proposed Zwiebel Creek interceptor sewer. The Zwiebel Creek Lift Station would pump flow east to a transition structure. Flow from the Zwiebel Creek Lift Station would be combined with pumped flow from the Mitchell Road Lift Station at the connection point to the dual force mains in the vicinity of South 53rd Street and Platteview Road. The project duration can generally be described as 24 months beginning in August 2022. This project has the following State & Federal Requirements MBE/WBE/DBE Subcontractor Participation Fair Share per 40 CFR 35.6580. - 14% (6% MBE & 8% WBE) E-Verify Federal Immigration Verification Davis Bacon Prevailing Wage & Certified Payroll American Iron and Steel (AIS) Products per FWPCA Section 608 A full listing of the State and Federal Regulations can be found at and is based upon the EPA's listing of "Additional Information on Cross-Cutting Federal Authorities" (http://water.epa.gov/grants_funding/dwsrf/xcuts.cfm) and the EPA's "Cross-Cutting Federal Authorities: A Handbook on Their Application in the Clean Water and Drinking Water State Revolving Fund Programs" (October 2013: http://www2.epa.gov/sites/production/files/2015-08/documents/crosscutterhandbook.pdf) as of October 12, 2015. This list is subject to change based upon the federal authorities of the EPA.

Post-Bid

Water / Sewer

$12,000,000.00

Public - County

New Construction, Site Work

80

22

70

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
42
Bidding Soon
535
All Active Projects
229
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2022

August 15, 2022

img_map_placeholder

17305 NE-50, Springfield, NE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.