BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Doylestown, Pennsylvania. Completed plans call for site work for a water / sewer project.

SCOPE OF WORK 1 total 4' x 20' galvanized truss frame ramp hinged on both sides with light gray composite railing system and decking. To include replacement of existing approach wood railing to matching composite. Including all mounting hardware to existing concrete approach.PERFORMANCE BOND with surety in the amount of 100% of the contract amount. The Performance Bond shall be conditioned upon the faithful performance of the contract in accordance with the plans, specifications and conditions of the contract. Build (1) Lakeside Dock total 8'x20' floating dock to include the following; Light gray composite decking Light gray composite railing system on 3 sides Ground contact treated lumber framing with floats Pile mounting hardware (4) Rolling tires mounted to underside for removing dock (4) 12" pile mounting hardware (4) 30 lbs per square foot live load buoyancy Price to include all above materials, delivery and installation. Old docks and ramp removed by others. CLARIFICATION DEADLINE 5/11/2022 5:00 PM LABOR AND MATERIAL (PAYMENT) BOND with surety in the amount of 100% of the contract amount. The Labor and Material Bond shall be conditioned upon the prompt payment of all material furnished and/or labor supplied in the prosecution of the work. Also required is a MAINTENANCE BOND with surety in the amount of 10% of the contract amount. The Maintenance Bond shall be surety against defective or inferior materials or workmanship which may develop during a period of one year from date of total completion and acceptance of all work performed under the contract. This unit cost contract shall start on or about June 1, 2022. The total cost of the contract, including any extensions, cannot exceed the bid threshold. The quantities shown below are the facility's estimated usage for the initial contract period. The County reserves the right to increase or decrease quantities according to actual usage and does not guarantee orders for any specific amounts or item(s). Orders (will be called in on an "as needed basis and will be delivered FOB (destination or installation location). Any award from this quote will be made to the lowest responsive, responsible vendor. The County of Bucks reserves the right to reject any response not submitted on this document

Bid Results

Water / Sewer

$18,833.00

Public - County

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
236
Bidding Soon
4,224
All Active Projects
2,016
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2022

August 1, 2022

img_map_placeholder

399 Creek Rd, Doylestown, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.