Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Memphis, Tennessee. Contact the soliciting agency for additional information.
Sources Sought/Request for Information-FY22 This market survey is for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATIN FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SOURCES SOUGHT ANNOUNCEMENT. No reimbursement will be made for any costs associated with providing information in response to this announcement or any follow-up information requests. The purpose of this announcement is to gain knowledge of interest, capabilities and qualifications of all firms interested in participating in the competition to compete and perform a firm-fixed price construction contract. The Government will not pay for any information provided as a result of this market survey. The U.S. Army Corps of Engineers, Memphis District (MVM) is conducting research to determine the capabilities of potential contractors to support the Mississippi Rivers and Tributaries (MR&T) Channel Improvement Project. MVM is seeking qualified, experienced sources capable of performing the construction and maintenance of various types of stone navigation structures to include all types of dikes, revetments, chevrons, bendway weirs, hardpoints, and other river training structures in the Mississippi River within the boundaries of the Memphis District from approximate River Mile 954 to 599 Above the Head of Passes (AHP). Maintaining the MR&T Channel Improvement Project as authorized requires the construction and maintenance of various types of stone navigation structures, to include all types of dikes, revetments, chevrons, bendway weirs, hardpoints, and other river training structures. Additional work may include placement of stone fill and longitudinal peaked stone toe protection in specified areas such as dike fields, revetments, and other locations along top bank of the river and riprap bank paving to include bank clearing, grading and excavation. Since project initiation, over 1,100 stone navigation structures with an estimated total length over 350 miles and approximately 700 miles of revetment have been constructed. Individual Task Orders will be issued throughout the life of the contract designating the locations and types of work that will be performed. Estimated durations for the projects will be determined per task order. The work on each task order will consist of furnishing all plant, labor and materials for the work to be performed. Specific items of work may include, but not be limited to clearing and grading of the riverbank, placement of stone bank paving, placement of longitudinal stone toe protection and stone fill in specified areas such as dike fields, revetments, and other locations, and placement of various types of stone to construct dikes, bendway weirs, and other river training structures. The work shall be performed according to the base MATOC specifications and supplemental specifications & plans for each individual Task Order. The required daily production rates will vary based on the size, scope, and complexity of the individual task orders issued as well as the method of stone placement. Generally, the production rates used to determine the various methods of stone placement will be approximately as follows: 8,000 tons per day for quote mark drag-off quote mark placement; 3,000 tons per day for quote mark bailing quote mark placement; and 1,000 tons per day for placement involving hauling stone with trucks. Additionally, the average required daily production for bank paving placement will be approximately 2,000 tons per day. The contract work is performed during variable river stages and additional equipment may be needed to meet the required production rates. In addition, a sufficient number of towboats and supply barges will be required to meet daily production rates at any location between River Miles 954 to 320 AHP. The MATOC ordering period will be four (4) years. The total contract capacity will not exceed $49M. The estimated minimum size of a task order is $1 Million. The estimated maximum size of a task order is $10 million with the average size task order being $5 Million. Firms must have the ability to perform up to two task orders simultaneously. Upon award to the initial MATOC pool, individual task orders will be competitively issued to MATOC holders, through designating the locations and types of work that will be performed on each task order. Acquisition Strategy: U.S. Army Corps of Engineers, Memphis District (MVM), proposes to award up to three (3) or more Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contracts (MATOC) utilizing Other Heavy and Civil Engineering Construction, NAICS 237990. The Small Business Size Standard for this requirement is $39.5 million. Offerors must be registered with the System for Award Management (SAM), including the NAICS code they are bidding under, in order to receive a Government contract award. To register, the SAM Internet address is : https://www.sam.gov. The U.S. Army Corps of Engineers, Memphis District will be the procuring office. All applicable information should be sent via e-mail to Judy E. Stallion at Judy.E.Stallion@usace.army.mil. The due date and time for responses to this announcement is 1:30pm C.S.T. May 30, 2022. The method of contractor selection has not been determined at this time.
Conceptual
Water / Sewer
$49,000,000.00
Public - Federal
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
November 30, 2022
Multiple Locations, Memphis, TN
Related To This Project
Memphis, TN
--
Memphis, TN
--
Memphis, TN
Bid Date: Mar 17 2022
Memphis, TN
Bid Date: May 11 2022
Memphis, TN
Bid Date: May 11 2022
Memphis, TN
--
Memphis, TN
Bid Date: Apr 27 2022
Memphis, TN
Bid Date: Apr 27 2022
Memphis, TN
Bid Date: Apr 20 2022
Memphis, TN
Bid Date: Apr 28 2022
Memphis, TN
Bid Date: Mar 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.