EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Mahomet, Illinois. Working plans call for site work for a road / highway; and for paving for a road / highway.

**As of May 9, 2022, bids were rejected because they are almost 50% over budget and many prices are unreasonably high due to price volatility and small quantities. No definite date for the rebid. The Village of Mahomet is accepting sealed proposals to perform the 2022 General HMA Paving Project. This project includes: Center Street: some curb and gutter removal and replacement, edge milling and resurfacing from NS tracks to Peacock Drive. Center Street bubble pavement at #1001 through #1005: Curb and gutter replacement around bubble (raise elevation), gutter replacement adjacent to bubble, milling and resurfacing the bubble pavement. Also includes sidewalk and driveway apron reconstruction and pavement patching, seeding and restoration. The Village of Mahomet reserves the right to reject any or all bids or portions thereof and to waive any formality or technicality in any bids in the interest of the Village.

Final Planning

Roads / Highways

$295,619.00

Public - City

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
42
Bidding Soon
538
All Active Projects
270
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

December 9, 2022

img_map_placeholder

S Center St, Mahomet, IL


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

2022 General HMA Paving Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.