BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in North Parkersburg, West Virginia. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of September 9, 2022, project was awarded to Kelly Paving, Inc, awarded amount is $236,633.50.** At Parkersburg Correctional Center and Jail, there is one main access road, the main parking lot area, and two roads that go to the upper parking lot area at the facility that asphalt paving must be installed. The contractor must remove a section of existing asphalt paving on the main access road and install new. The contractor must install new asphalt paving on the main parking lot area. The contractor must remove a section of the existing asphalt paving and install new on one of the roads (right side) that goes to the upper parking lot area. The contractor must install new asphalt paving on one of the roads that goes to the upper parking lot area. Below is additional information concerning the project. Any individual that does attempt to represent two or more vendors will be required to select one vendor to which the individual's attendance will be attributed. The vendors not selected will be deemed to have not attended the pre-bid meeting unless another individual attended on their behalf. Submitted e-mails should have a solicitation number in the subject line. Question Submission Deadline: Submit Questions to: 2:00 PM E.S.T. on July 22, 2022 1409 Greenbrier Street Charleston, WV 25311 Fax: (304) 957-7622 Email: Philip.K.Farley@wv.gov (Email is the preferred method.) The Division of Corrections and Rehabilitation reserves the right to reject the bid of any vendor as Non-Responsible in accordance with W. Va. Code of State Rules 148-1- 5.3, when it is determined that the vendor submitting the bid does not have the capability to fully perform or lacks the integrity and reliability to assure good-faith performance In lieu of the Bid Bond, Performance Bond, and Labor/Material Payment Bond, the Vendor may provide certified checks, cashier's checks, or irrevocable letters of credit

Award

Roads / Highways

$236,634.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
37
Bidding Soon
614
All Active Projects
191
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2022

August 29, 2022

img_map_placeholder

225 Holiday Hills Dr, North Parkersburg, WV

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.