Published August 11, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a mixed-use development in Hapeville, Georgia. Completed plans call for site work for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; and sidewalk / parking lot.

The Project consists of construction of a new splash pad and park improvements, including sidewalk, curb & gutter, brick pavers, playground equipment, and related work. Bids will be received for a single prime Contract. Bids shall be on a unit price basis as indicated in the Bid Form. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. No proposal will be considered unless it is accompanied by satisfactory evidence that the Bidder holds either a Georgia State Contractor's License, Georgia State Utility Contractor's License, or qualifications with the Georgia Department of Transportation for similar work, in compliance with Act. O.C.G.A. 43 14 and 43-41. Failure to provide the bidder's license or qualification number on the outside of the sealed proposal will result in rejection of the bid. If the Contract is to be awarded, Owner will award the Contract on the basis of the base bid alone. All required federal, state, and local permits as well as required easements or rights of way for the project have not been obtained. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time of 90 calendar days. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment submitted once per month as provided in the General Conditions. Bidders must make positive efforts to use small and minority owned businesses. Bidders must comply with 41 CFR 60 4, in regard to affirmative action, to ensure equal opportunity to females and minorities and will apply the timetables and goals set forth in 41 CFR 60 4.Bidders must comply with the President's Executive Order No. ll246, as amended, prohibiting discrimination in employment regarding race, creed, color, sex or national origin; Title VI of the Civil Rights Acts of l964; the Davis Bacon Act; the Anti Kickback Act; and the Contract Work Hours Standards Act. Contractor shall pay Owner $_250.00_ for each day that expires after the time (as duly adjusted pursuant to the Contract) specified in Paragraph 4.02.A above for Substantial Completion until the Work is substantially complete. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Time (as duly adjusted pursuant to the Contract) for completion and readiness for final payment, Contractor shall pay Owner $_300.00_ for each day that expires after such time until the Work is completed and ready for final payment

Award

Playgrounds / Parks / Athletic Fields

$931,290.00

Public - City

Paving, Site Work

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Temporary Roads, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Planting Preparation, Mulching
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Storm Utility Drainage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
289
Active Projects
132
Bidding Soon
2,380
All Active Projects
1,019
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.