Site work and paving for a road / highway in Rock Falls, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.

TOWN ROAD RECONSTRUCTION The Town of Rock Creek, Dunn County, Wisconsin is seeking bids for reconstruction or overlay of several town road projects as listed below. Project 1 Crack Sealing and Chip Coat 150th Avenue from CTH O to 810th Street. Total project length approximately 7920 feet. Project is to include the following: 1. Crack sealing only from CTH O west to 890th Street, approximately 2640 feet. 2. Double chip and seal coat from 890th Street west to 880th Street, approximately 1320 feet by 20 feet wide 3. Crack sealing only from 880th Street west to 850th Street, approximately 3960 feet. 90th Avenue from 1010th Street east to CTH H. Total project length approximately 10560 feet. Project is to include the following: 1. Crack sealing only from 1010th Street east to CTH H. Total project length approximately 10560 feet 1010th Street from 140th Avenue north to 190th Street. Total project length approximately 6600 feet. 1. Single chip and seal coat, approximately 6600 feet in length by 20 feet wide. Project 2 Pulverize and Repave 110th Avenue from 1010th Street west to 1000th Street. Total project length approximately 1320 feet. Project is to include the following: 1. Preparation of roadway subgrade. Prepare 27 feet wide road base with adequately safe side slopes, ditches, and drainage control. Seeding and mulching of disturbed soils. Lump sum bid required for this item. 2. Pulverization of existing pavement (existing pavement approximately 2" thickness). Approximately, 3000 square yards required. 3. Additional crushed limestone base course added to create a total thickness of 6 inches of base course, compacted. Approximately, 800 tons required. 4. Machine compaction, watering, and fine grading of road base. Incidental to Item 3. 5. Placement of asphaltic pavement, 2.5" compacted thickness, 20 feet wide. Approximately 460 tons required. 6. 2 feet wide crushed limestone shoulders compacted. Approximately, 125 tons of gravel required. 7. Milling of joints at west end of project. Approximately, 20 linear feet. Incidental to Item 2. Project 3 2 thick Asphaltic Overlay 140th Avenue from 1000th Street east to county line. Total project length approximately 1320 feet. Project is to include the following: 1. Placement of asphaltic pavement with binder, 2.0 compacted thickness, 20 feet wide. Approximately 370 tons required. 2. 2 feet wide crushed limestone shoulders compacted. Approximately, 125 tons of gravel required. 3. Milling of joints at east end of project. Approximately, 20 linear feet. Incidental to Item 2. Project 4 2 thick Asphaltic Overlay 1000th Street from 90th Avenue north to 110th Avenue. Total project length approximately 2640 feet. Project is to include the following: 1. Placement of asphaltic pavement with binder, 2.0 compacted thickness, 20 feet wide. Approximately 740 tons required. 2. 2 feet wide crushed limestone shoulders compacted. Approximately, 250 tons of gravel required. 3. Milling of joints at each end of project. Approximately, 40 linear feet. Incidental to Item 2. Please provide individual bids for each project using the following unit prices: 1. Asphalt paving: Tons 2. Crushed limestone base: Tons 3. Crushed limestone shoulders: Tons 4. Pulverization of existing pavement: Square Yards 5. Preparation of roadway subgrade: Lump Sum 6. Crack sealing and chip coat Lump Sum ALSO, provide an estimated total for all segments as a single project using the above units. Final cost paid to be determined by units used times unit prices bid. Bid bond required. Scheduled completion by October 31, 2022. The Town of Rock Creek reserves the right to reject any or all bids. For more information and bid tabs contact Town Chair Harry Warden, E8629 150th Avenue, Mondovi, WI 54755, phone 715-875-4745 or 715-495-6316(mobile). Or Road Maintenance Superintendent Chris Gruber 715-579-7634

Post-Bid

Roads / Highways

$284,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
32
Active Projects
21
Bidding Soon
364
All Active Projects
140
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

June 16, 2022

img_map_placeholder

Multiple Locations, Rock Falls, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.