BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Sacramento, California. Contact the soliciting agency for additional information.

Contractor agrees to provide to California Department of Transportation (Caltrans) all labor, equipment, tools, materials, travel, and incidentals necessary to perform preventative maintenance, testing, and routine services for the Silent Knight Faranhyt IFP-1000VIP Fire Alarm Control Panel and its related components at Caltrans Headquarters building, located at 1120 N Street, Sacramento, California 95814. Refer to the Scope of Work (Exhibit A) within the Proposed Form of Agreement (Attachment 8) for a more complete description of services. Contractor License Type Description C-10 Electrical Contractor Written Question Submittal 7/11/2022 Bidders are encouraged to submit their written questions via e-mail to Robert.Carothers@dot.ca.gov.Questions must be sent to one of the following: Email: Robert.Carothers@dot.ca.gov Or mail to: California Department of Transportation (Caltrans) Division of Procurement and Contracts Attention: Robert Carothers 1727 30th Street, MS 65 Sacramento, CA 9581 Proposed Award Date (estimate) 7/29/2022 The total bid proposal for this Agreement must not exceed $388,000.00. A bid proposal over $388,000.00 will be deemed non-responsive and will be rejected Payment Bond (ADM-2009) Requirement: If the successful bidders bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have.

Bid Results

Municipal

$75,825.00

Public - State/Provincial

Service, Maintenance and Supply

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
127
Active Projects
79
Bidding Soon
1,578
All Active Projects
667
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2022

August 1, 2022

img_map_placeholder

1120 N St, Sacramento, CA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.