Renovation of a fire / police facility in Orange Beach, Alabama. Completed plans call for the renovation of a fire / police facility.
The Scope of Work for Fire Training Tower Refurbishment is described below. The work is broken out into a Base Bid and Additive Alternate. The Fire Department desires for all of the work to be completed, but the City reserves the right to award based on either the "Base Bid Total" or "Base Bid + Additive Alternate Total" depending on the availability of funds. See attached original plans. Contractor is responsible to provide refurbishment of the Fire Training Tower in this scope of work, including all labor, materials, tools, supervision, and equipment necessary to complete the Work. Base Bid: 1. Burn room lining System for Annex Burn Room (remove and replace) 2. Burn room lining System for 2nd Floor Burn Room (remove and replace) 3. Brush Seal and Spring Closures for all burn rooms 4. 6- 4x4 Westtemp panels for overhead and 1 door 5. Contractor acknowledges that the documents included with this Contract Agreement are complete and represent the design intent. As such, the bid total pricing included with this Contract Agreement is firm and reflects the work required for complete refurbishment of the Fire Training Tower and associated work in accordance with the intent of the Contract Documents and is not subject to change. 6. The specific items included as part of this scope of work are listed for emphasis only and are not intended to limit the scope of work in any way. 7. The Work of this contract is hereby further clarified and defined. In accordance with the nature of this contract, this clarification does not relieve the Contractor from providing all elements of a complete system that conforms to the requirements of the Contract Documents. It is the Contractor's responsibility, based on their expertise and knowledge of the work, to include all items, materials, and procedures necessary to complete the execution of the work that, although not shown, can be reasonably inferred to be a part of the work. 8. Contractor is responsible to supply and install all work in accordance with all applicable codes and manufacturer and industry standards. 9. Contractor's price includes: a. All taxes associated with this scope of work; b. All salaried and field personnel required to complete the work; c. All permits required for this work; and d. Contractor acknowledges that multiple mobilizations may be required and has accounted for all costs in the lump sum price. 10. Contractor is responsible for all material handling required to perform this scope of work. 11. Contractor shall coordinate delivery of material with the Project Schedule and the City. Contractor shall properly store all materials and equipment per the manufacturer's recommendations in the event that materials or equipment are delivered prematurely. 12. Contractor is responsible for all field measurements required to complete all installations. 13. Contractor is responsible for all layout required to complete all installations.
Award
Fire / Police
$135,230.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2022
July 4, 2022
25853 John M Snook Dr, Orange Beach, AL
Related To This Project
Orange Beach, AL
Bid Date: Oct 14 2021
Orange Beach, AL
Bid Date: Feb 17 2022
Orange Beach, AL
Bid Date: Jun 30 2022
Orange Beach, AL
Bid Date: Jun 30 2022
Orange Beach, AL
Bid Date: Sep 16 2021
Orange Beach, AL
--
Orange Beach, AL
--
Orange Beach, AL
Bid Date: Jul 21 2022
Orange Beach, AL
Bid Date: Oct 21 2021
Orange Beach, AL
Bid Date: Mar 31 2022
Orange Beach, AL
Bid Date: Apr 28 2022
Orange Beach, AL
--
Orange Beach, AL
--
Orange Beach, AL
--
Orange Beach, AL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.