EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 25, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of an educational facility in Zion, Illinois. Working plans call for the renovation of a educational facility.

Project scope includes removal and replacement of data cables (approximately 200 - 300 ports) and reconnection to existing devices at new IDF locations. All work must be completed no later than August 1, 2022. The entities must be registered with the Illinois Unified Certification Program (IL UCP) and prospective bidders must provide IL UCP certificate(s) with their bid proposal to be included in the goal for this project. The bidder shall identify on the spaces provided on the bid form names of certified vendors which will perform any portion of the work specified and the dollar value of the provided services that are part of the bid amount. The bids will be publicly opened and read in the Business Office Conference Room located at Zion Benton Twp. H.S. Campus, 3901 W. 21st St. Zion, IL on Thursday, May 12, 2022 - 10:300 AM. The Board reserves the right to reject any or all bids in whole or in part and to waive any informality therein. All proposals submitted shall remain firm for a period of sixty (60) days after official opening of bids.

Final Planning

Educational

$700,000.00

Public - City

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts
Division 34 - Transportation

Division 34 - Transportation

Transportation

Find More Local Projects

Within 75 Miles of This Project
237
Active Projects
166
Bidding Soon
2,543
All Active Projects
1,082
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Main Campus Data Cable Replacement 2022

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.