BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Moreno Valley, California. Completed plans call for the renovation of a educational facility.

re-qualifications must be submitted no later than ten (10) business days prior to bid opening, and bidders must be Pre-qualified a minimum of five (5) business days prior to bid opening. Bidder shall provide the surety Payment and Performance Bonds as specified in the General Conditions within ten (10) calendar days after notification of the LEASE-LEASEBACK CONTRACTOR S award of the contract to the Bidder. Bids must be submitted on the Contract Bid Forms, which are part of this Bid Package for the Project. Bid documents will be sent to SUBCONTRACTORS through Procore upon request; contact karen@neffcon.com . Each bid must conform and be responsive to all pertinent Bidding and Contract Documents. Each bid must be on LEASE-LEASEBACK CONTRACTOR S Bid Form and shall be accompanied by: Bid Security; Non-Collusion Declaration; Site Visit Certification; Certification of Compliance with DVBE Policy; Proposed Subcontractors; and Submittal Substitution Request (if applicable). Labor Compliance Notice: The DISTRICT/LEASE-LEASEBACK CONTRACTOR, being the awarding body, is entitled to request certified payroll records for inspection, pursuant to Section 1776 of the Labor Code. SUBCONTRACTORS assume responsibility to provide all of their subcontractors with notification of prevailing wage requirements, as lower-tier subcontractors must also comply with prevailing wage laws and regulations. SUBCONTRACTORS are advised that this contract is subject to monitoring by the Compliance Monitoring Unit ( CMU ), a Division of the Department of Industrial Relations ( DIR ). The Subcontractor and all lower-tier subcontractors shall be required to furnish electronic certified payroll reports ( CPR ) directly to the Labor Commissioner/CMU in accordance with Title 8, California Code of Regulations, Section 16460 et seq. The successful Bidder and all subcontractors utilized by the successful Bidder on the project shall maintain and furnish to the DIR on a periodic basis as directed by the DIR, but in no event less frequent than once each month, certified copies of weekly payroll reports signed under penalty of perjury. The DIR shall review the payroll reports to verify compliance with the prevailing wage requirements and shall conduct audits and onsite investigation as it deems necessary. The prevailing rate of per diem wages and a description of employer payments are on file at the OWNER S OFFICE and are available to any interested party upon request. If the payroll records or reports are delinquent or inadequate, the OWNER shall withhold contract payments. Additionally, if after an investigation it is established that an underpayment occurred, the OWNER shall withhold contract payments equal to the amount of underpayment and applicable penalties. The OWNER thereafter shall follow the requirements regarding notice to the CONTRACTOR or subcontractor as provided in Labor Code Section 1771.6 . NOTE: Weekly CPR for Subcontractors and all lower tier subcontractors must be uploaded to LCP Tracker. NO FAXED OR HARD COPY CERTIFIED PAYROLL REPORTS WILL BE ACCEPTED. CPR must be sequentially numbered (1 through Final) and include Non-Performance reports if no work was done during any specific week. For questions relating to the project contact: David Smith via e-mail - david@neffcon.com

Post-Bid

Educational

$410,000.00

Public - City

Renovation

Our team is requesting plans for this project.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
99
Bidding Soon
2,192
All Active Projects
901
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 21, 2022

November 21, 2022

img_map_placeholder

Multiple Locations, Moreno Valley, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.