Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Moreno Valley, California. Completed plans call for the renovation of a educational facility.
re-qualifications must be submitted no later than ten (10) business days prior to bid opening, and bidders must be Pre-qualified a minimum of five (5) business days prior to bid opening. Bidder shall provide the surety Payment and Performance Bonds as specified in the General Conditions within ten (10) calendar days after notification of the LEASE-LEASEBACK CONTRACTOR S award of the contract to the Bidder. Bids must be submitted on the Contract Bid Forms, which are part of this Bid Package for the Project. Bid documents will be sent to SUBCONTRACTORS through Procore upon request; contact karen@neffcon.com . Each bid must conform and be responsive to all pertinent Bidding and Contract Documents. Each bid must be on LEASE-LEASEBACK CONTRACTOR S Bid Form and shall be accompanied by: Bid Security; Non-Collusion Declaration; Site Visit Certification; Certification of Compliance with DVBE Policy; Proposed Subcontractors; and Submittal Substitution Request (if applicable). Labor Compliance Notice: The DISTRICT/LEASE-LEASEBACK CONTRACTOR, being the awarding body, is entitled to request certified payroll records for inspection, pursuant to Section 1776 of the Labor Code. SUBCONTRACTORS assume responsibility to provide all of their subcontractors with notification of prevailing wage requirements, as lower-tier subcontractors must also comply with prevailing wage laws and regulations. SUBCONTRACTORS are advised that this contract is subject to monitoring by the Compliance Monitoring Unit ( CMU ), a Division of the Department of Industrial Relations ( DIR ). The Subcontractor and all lower-tier subcontractors shall be required to furnish electronic certified payroll reports ( CPR ) directly to the Labor Commissioner/CMU in accordance with Title 8, California Code of Regulations, Section 16460 et seq. The successful Bidder and all subcontractors utilized by the successful Bidder on the project shall maintain and furnish to the DIR on a periodic basis as directed by the DIR, but in no event less frequent than once each month, certified copies of weekly payroll reports signed under penalty of perjury. The DIR shall review the payroll reports to verify compliance with the prevailing wage requirements and shall conduct audits and onsite investigation as it deems necessary. The prevailing rate of per diem wages and a description of employer payments are on file at the OWNER S OFFICE and are available to any interested party upon request. If the payroll records or reports are delinquent or inadequate, the OWNER shall withhold contract payments. Additionally, if after an investigation it is established that an underpayment occurred, the OWNER shall withhold contract payments equal to the amount of underpayment and applicable penalties. The OWNER thereafter shall follow the requirements regarding notice to the CONTRACTOR or subcontractor as provided in Labor Code Section 1771.6 . NOTE: Weekly CPR for Subcontractors and all lower tier subcontractors must be uploaded to LCP Tracker. NO FAXED OR HARD COPY CERTIFIED PAYROLL REPORTS WILL BE ACCEPTED. CPR must be sequentially numbered (1 through Final) and include Non-Performance reports if no work was done during any specific week. For questions relating to the project contact: David Smith via e-mail - david@neffcon.com
Post-Bid
Educational
$410,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 21, 2022
November 21, 2022
Multiple Locations, Moreno Valley, CA
Related To This Project
Moreno Valley, CA
Bid Date: Oct 04 2022
Moreno Valley, CA
Bid Date: Apr 06 2023
Moreno Valley, CA
Bid Date: Sep 15 2022
Moreno Valley, CA
Bid Date: Sep 02 2022
Moreno Valley, CA
Bid Date: Nov 06 2024
Moreno Valley, CA
Bid Date: Dec 07 2022
Moreno Valley, CA
Bid Date: Nov 09 2022
Moreno Valley, CA
Bid Date: Sep 13 2022
Moreno Valley, CA
Bid Date: Oct 20 2022
Moreno Valley, CA
Bid Date: Oct 31 2022
Moreno Valley, CA
Bid Date: Oct 18 2022
Moreno Valley, CA
Bid Date: Aug 25 2022
Moreno Valley, CA
Bid Date: Oct 19 2022
Moreno Valley, CA
Bid Date: Nov 29 2022
Huntington Beach, CA
Bid Date: Aug 30 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.