Published July 26, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a water / sewer project in Broken Arrow, Oklahoma. Completed plans call for site work for a water / sewer project.

The project includes, but is not limited to, the following major work items: o This project consists of rehabilitation of approximately 3,889 linear feet of 54-inch and 454 linear feet of 48-inch reinforced concrete pipe and the associated manhole structures. The project extents consists of eight (8) manholes scheduled for rehabilitation and one (1) new 8-foot diameter manhole. The owner will evaluate award of two (2) additive alternates each consisting of an additional segment. Also included are cleaning and pre-construction CCTV of the proposed pipes scheduled for rehabilitation as well as other necessary appurtenances and surface restoration, Proposals shall be accompanied by either a Bid Bond or certified check upon a national or state bank in an amount not less than 5% of the total maximum bid price, payable without recourse to BAMA as a guarantee that the bidder will, within 10 days after notice of award, enter into a Contract and furnish a Performance Bond and Payment Bond upon the forms provided, each in the amount of 100% of the Contract Price, from a surety licensed to conduct business in Oklahoma and named in the current list of "Surety Companies Acceptable on Federal Bonds" as published in Circular 570 (amended) by the Audit Staff Bureau of Accounts, U.S. Treasury Department. The surety for the Performance Bond and Payment Bond shall have an "A" minimum rating of performance and a financial rating strength of five times the Contract Price, al as stated in the current "Best's Key Rating Guide, Property-Liability." Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the Bond and furnish the required bonds according to the Public Competitive Bidding Act of 1974. BAMA reserves the right to reject any or all bids and accept or reject any formalities. Award shall be made to the responsive, responsible bidder; however, BAMA reserves the right, after evaluation of all bids received, to make no recommendation to BAMA regarding the award of any bid in the event non-responsive, non-conforming, or otherwise unacceptable bids are received, or if budgetary constraints or other unanticipated factors exist. No bid may be withdrawn until the expiration of one hundred twenty (120) days from the date bids are opened. BAMA reserves the right to award the Contract on the basis of the Bid and to consider other factors as described in the documents associated with this invitation. BAMA reserves the right to reject any and all bids in accordance with the Oklahoma Public Competitive Bidding Act of 1974. Conditional bids shall not be accepted.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Site Work

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Other Specialties, Scales
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Embankments, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
57
Bidding Soon
733
All Active Projects
356
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 26, 2022

img_map_placeholder

Multiple Locations, Broken Arrow, OK

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Haikey Creek Interceptor Phase 1 Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.