BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Fuquay Varina, North Carolina. Completed plans call for the construction of a 242,665-square-foot, three-story above grade educational facility; and for site work for a educational facility.

As of April 18, 2023, this project has been awarded, but the awarded contractors have not yet been announced. Bid packages bidding to PRE-QUALIFIED CONTRACTORS ONLY: GROUP 2B - BIDS MAY 12, 2022 BP 07B: ROOFING BP 09A: GYPSUM BOARD ASSEMBLIES AND LIGHT GAGE FRAMING BP 21A: FIRE PROTECTION BP 22A: PLUMBING AND VAPOR MITIGATION BP 23A: HVAC (MECHANICAL) BP 26A: ELECTRICAL AND FIRE ALARM For questions regarding this information please contact Lisa Florack at Lisa.Florack@skanska.com, or by phone at (919) 941-7900. UPDATED: - Last day for Questions: 4/22 at 5:00 PM - Addenda issued 4/27 Fuquay Varina Middle School Replacement is a new 242,665 square foot middle school, designed according to current WCPSS Education specifications and design guidelines, expanded to include six (6) additional classrooms to support future growth. The building consists of a high bay core area with common spaces and a three-story classroom wing. A retaining wall is required at the east end of the core area to accommodate changes in site grades. The main floor of the core area is set at a full floor level above the ground floor area of the classroom wings. a. In the core area at the auditorium and PE spaces, all walls are load bearing masonry with a few structural steel columns to support long spans. In the remaining core area and classrooms wings, the building is steel frame structure. Foundation systems consists of concrete spread footings at column locations and strip foundations at the bearing wall locations. There will be some areas of aggregate piers where soil conditions warrant their use. b. The exterior wall system is brick veneer or CMU block with metal stud back up material. c. Theroofsystemisamodifiedbitumensystemovernewtaperedlightweightconcreteonlowslopestructural framing. d. Interior partitions consist of CMU or metal stud framing with gypsum wall board panels finish. The project contains a second 1,116 square foot building which includes toilets and storage to serve the athletic venues. The building is load bearing masonry construction with steel framed roof, with metal panels. In support of Wake County Public School System diversity and inclusion efforts, Skanska USA Building Inc. is committed to creating an environment of inclusion that affords small, minority, and women-owned businesses equal access to the economic opportunities that sustain our community. Small, minority, and women-owned businesses are encouraged to participate. Guidelines established in the North Carolina General Statutes and good faith efforts will be followed. PLEASE NOTE: Overall contract is 86,025,584. Construction cost of this bid package is not yet known.

Post-Bid

Educational

$20,000,000.00

Public - County

New Construction, Site Work

694

35

124

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
70
Bidding Soon
1,258
All Active Projects
513
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

July 11, 2022

img_map_placeholder

1201 Bowling Rd, Fuquay Varina, NC


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.