Site work and paving for a mixed-use development in Mercer, Pennsylvania. Completed plans call for site work for a transportation facility; for paving for a transportation facility; sidewalk / parking lot; and sidewalk / parking lot.

Questions regarding the technical aspects of the bid drawings and/or the contract documents should be directed to the Project Engineer. The Project Engineer is Nicholas J. Barber and can be contacted by email or phone at nbarber@mjinc.com or 412.423.2961. Bids shall be on the prescribed forms furnished by the Borough of Grove City and shall be in accordance with the General Provisions, Proposal Requirements and Conditions Section 20. The Borough of Grove City expressly reserves the right to accept or reject any or all bids or to waive informalities in the same. Each bidder must deposit with this proposal a guarantee in an amount equal to at least ten percent (10%) of his bid. The "Bid Guarantee" shall consist of a firm commitment such as a bid bond, certified check, or other negotiable instrument accompanying a bid as assurance that the bidder will, upon acceptance of his bid, execute such contractual documents as may be required within the time specified. No bidder may withdraw his bid within one hundred twenty (120) days after the actual date of the opening thereof. Work shall be commenced within ten (10) days of the date specified in the written notification to proceed and shall be fully and finally completed within thirty (30) calendar days of the date specified in the written notification to proceed. The Borough of Grove City hereby notifies that it will affirmatively ensure compliance with the regulations relative to nondiscrimination in Federally assisted programs of the Department of Transportation, title 49, Code of Federal Regulations, Part 26 (as they may be amended from time to time). The contractor or subcontractor, by submission of an offer and/or execution of a contract, certifies that it: a) is not owned or controlled by one or more citizens or nationals of a foreign country included in the list of countries that discriminate against U.S. firms published by the Office of the United States Trade Representative (USTR); b) has not knowingly entered into any contract or subcontract for this project with a contractor that is a citizen or national of a foreign country on said list, or is owned or controlled directly or indirectly by one or more citizens or nationals of a foreign country on said list; c) has not procured any product not subcontracted for the supply of any product for use on the project that is produced in a foreign county on said list. All bidders must comply with the Antibid Rigging Act and shall sign an affidavit as contained in the specifications. Successful bidder must enter into the Agreement and furnish a Contract bond and evidence of required insurance within fifteen (15) days after the notification of acceptance of such proposal, all as more specifically required in the Contract Documents. Wages as predetermined by the PA Secretary of Labor and Industry included in specifications and contract documents and/or addenda thereto shall be used by the contractor in paying labor in connection with the work under this contract. All work under this contract shall be under and subject to the regulations contained in Section R of the Contract Documents.

Bid Results

Sidewalks / Parking Lot

$98,212.00

Public - City

Paving, Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Finishes, Maintenance of Finishes
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Retaining Walls, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Storm Drainage Utilities, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
119
Bidding Soon
1,243
All Active Projects
595
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2022

June 17, 2022

img_map_placeholder

40 Oakley- Kelly Dr, Mercer, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Grove City Airport Contract 14 - Construct Hangar Site Prep & Parking Lot Relocation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.