BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a pre-engineered storage facility in Kearney, Missouri. Working plans call for site work for a pre-engineered storage facility.

Projects Descriptions: Remove/Install fencing at Kearney Public Works Recycle Center per the following: l Remove approximately 240 linear feet of existing woven wire fence and posts; l Install approximately 240 linear feet of 6 ft tall white vinyl, matching existing vinyl fence; l As part of bid, contractor to provide spec of proposed fencing, including height, design, material, and method of securing posts. Project Location: The job site is located at Kearney Public Works Recycling Center, 502 East 19th Street; Kearney, MO 64060. Pre-Bid Meeting: No pre-bid meeting has been scheduled. Prospective bidders can visit the site at any time. Provisions: The following provisions are required of the successful contractor and are further described in the bid packet: l City Occupation License (fee will be waived, if applicable); l Insurance naming City of Kearney as additional insured; Proof of 10-Hr OSHA Training, pursuant to RSMo 292.675; l Proof of participation in a Federal Work Authorization program (E-Verify), pursuant to RSMo 285.530 (required as part of bid submittal); l Proof of Lawful Presence, pursuant to RSMo 208.009; l American Products provision, pursuant to RSMo 34.353, if applicable; l Transient Employer provision for employers not domiciled in Missouri, pursuant to RSMo 285.230 The City reserves the right to award the contract by sections, to reject any or all bids, and to waive any informalities or irregularities therein. The City will affirmatively ensure that in any Contract entered into pursuant to this advertisement, that minority business enterprises will be afforded full opportunity to submit bids without discrimination, regardless of race, color, or national origin, in consideration for any award. No bidder may withdraw their bid within 60 days after the actual date of bid opening.

Final Planning

Warehouse / Distribution - Pre-Engineered Storage Building

$94,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
33
Bidding Soon
725
All Active Projects
313
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

January 4, 2023

img_map_placeholder

502 E 19th St, Kearney, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.