BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2025 at 8:00 PM

Updated June 11, 2025

Renovation of a water / sewer project in Traverse City, Michigan. Conceptual plans call for the renovation of a water / sewer project.

UPDATE : Currently, the standby generator at the Water Treatment Plant (WTP) is used to provide back up power to both the Low Service Pump Station and the WTP. This divides the available back up power between the two locations and limits the overall capacity that the plant can produce when running on generator power. Therefore, if a separate generator was installed at the Low Service Pump Station to serve that facility, the main plant generator could be dedicated to serve the WTP, thereby increasing capacity during a potential extended power outage. 11/30/23 Added 20% for increased labor and inflation. Project is in City of Traverse City capital budget fy 2025-2031 CIP _______________________________________________________________________ Currently, the standby generator at the Water Treatment Plant (WTP) is used to provide back up power to both the Low Service Pump Station and the WTP. This divides the available back up power between the two locations and limits the overall capacity that the plant can produce when running on generator power. Therefore, if a separate generator was installed at the Low Service Pump Station to serve that facility, the main plant generator could be dedicated to serve the WTP, thereby increasing capacity during a potential extended power outage. As of June 6, 2024, this project is included in the Rockland County 2024-2029 Capital Improvement Plan (CIP). Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$300,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
1
Bidding Soon
144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2026

Project location map

To Be Determined, Traverse City, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.