BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Hastings on Hudson, New York. Working plans call for the renovation of a municipal facility.

The scope of work includes restoration of the historic wood windows - including wood repair and select component replacement, glazing replacement, select sash unit replication, and finishing - at Village Hall in the Village of Hastings-on-Hudson Buyers Requirements General Requirements - Insurance Required - Prevailing Wage Required - Certified Payroll Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Maintenance Bond 100 % - Labor and Materials Bond 100 % Job Location 7 Maple Avenue, Hastings-on-Hudson, NY 10706 Question Acceptance Deadline 05/23/2022 04:00 PM EDT Questions are submitted online Yes The Scope of Work includes the following items: 1. Remove and properly dispose of existing window sashes, sills, and moldings as indicated in the door and window schedule in the construction documents. 2. Replicate existing window sashes at windows indicated in the schedule with new wood true divided lite sashes replicated to match existing configuration, operation, profile, and dimension, complete with laminated, low-e glazing, hardware and related items. 3. Repair and restore all existing windows to remain, including sashes, frames, moldings, and trims. Repairs to include wood consolidation, wood fill, dutchman of select areas, glazing replacement, weatherstripping and gasket replacement. Make sashes fully operational; weight and chain pockets to be opened and restored, replace and reconnect chains as necessary. 4. Replicate and replace wood sills at all windows (100%) with new wood units to match existing profile and dimension. 5. Provide and install new brick molds at all windows(100%) to match existing in profile and dimension. 6. Repair and restore all existing wood doors to remain, including doors, frames, moldings, and trims. Repairs to include wood consolidation, wood fill, dutchman of select areas, and weatherstripping and gasket replacement. Hardware to be removed prior to work, salvaged, and reinstalled at completion; confirm full operability. 7. Scrape all existing wood door and window components to remain. Prime and paint all new and existing window components. Finish color to be white. 8. Repair cracked cast stone sills (allowance = 22 units). Clean existing cracks and cut to clean, square opening. Fill with flexible sealant; color to match existing cast stone

Final Planning

Municipal

$200,000.00

Public - City

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
509
Active Projects
300
Bidding Soon
4,546
All Active Projects
2,045
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2022

September 27, 2022

img_map_placeholder

7 Maple Ave, Hastings on Hudson, NY

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.