Site work for a water / sewer project in Glendive, Montana. Completed plans call for site work for a water / sewer project.

The project consists of Phase 1 and 2 Collection System Rehabilitation Project. Phase 1 Collection System Rehabilitation Project is separated into two different sections, Phase 1A and Phase 1B. Phase 1A consists of replacing approximately 2,650 linear feet of existing 12-inch gravity sewer main with new 8-inch SDR 35 polyvinyl chloride (PVC) sewer main, installing new manholes, and reconnecting the sewer services. Phase 1B includes replacing 3,550 linear feet of existing 12-inch gravity sewer main with new 12-inch SDR 35 PVC sewer main, installing new manholes, and reconnecting the sewer services. Phase 1B also includes jack and boring 230 linear feet of the 12-inch sewer main underneath the Burlington Northern Santa Fe (BNSF) railroad and Highway 16. Phase 2 Collection System Rehabilitation Project is separated into four different sections, Phase 2A, Phase 2B, Phase 2C, and Phase 2D. Phase 2A consists of replacing approximately 336 linear feet of existing 12-inch gravity sewer main with new 12-inch SDR 35 PVC sewer main; replacing 1,902 linear feet of existing 10-inch gravity sewer main with new 10-inch SDR 35 PVC sewer main; replacing 42 linear feet of existing 8-inch gravity sewer main with new 8-inch SDR 35 PVC sewer main; installing new manholes; and reconnecting sewer services. Phase 2A also includes open cut installation of approximately 29 linear feet of 10-inch PVC under Dry Creek. Phase 2B consists of relacing approximately 980 linear feet of existing 8-inch gravity sewer main with new 8-inch SDR 35 sewer main, installing new manholes, and reconnecting sewer services. Phase 2B also includes jacking and boring approximately 28 linear feet of 8-inch PVC carrier pipe in 16-inch steel casing under Dry Creek. Phase 2C consists of replacing approximately 1,940 linear feet of existing 8-inch gravity sewer main with new 8-inch SDR 35 PVC sewer main, installing new manholes, and reconnecting sewer services. Phase 2D consists of replacing approximately 1,160 linear feet of existing 8-inch gravity sewer main with new 8-inch SDR 35 PVC sewer main, replacing approximately 710 linear feet of existing 8-inch gravity sewer main with new 8-inch SDR 26 PVC sewer main, installing new manholes, and reconnecting sewer services. Est. Value Notes: $4,000,000.00 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing and must be received by no later than 5 p.m. local time on February 23, 2023. Written comments may be submitted to Gina Barry of Great West Engineering by mail at: 6780 Trade Center Avenue, Billings, MT 59101 or email at: gbarry@greatwesteng.com.

Bid Results

Water / Sewer

$8,101,820.00

Public - City

Site Work

38

18

12

10

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
9
All Active Projects
7
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

May 1, 2023

img_map_placeholder

Multiple Locations, Glendive, MT


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.