Site work for a water / sewer project in Glendive, Montana. Completed plans call for site work for a water / sewer project.

The project consists of Phase 1 and 2 Collection System Rehabilitation Project. Phase 1 Collection System Rehabilitation Project is separated into two different sections, Phase 1A and Phase 1B. Phase 1A consists of replacing approximately 2,650 linear feet of existing 12-inch gravity sewer main with new 8-inch SDR 35 polyvinyl chloride (PVC) sewer main, installing new manholes, and reconnecting the sewer services. Phase 1B includes replacing 3,550 linear feet of existing 12-inch gravity sewer main with new 12-inch SDR 35 PVC sewer main, installing new manholes, and reconnecting the sewer services. Phase 1B also includes jack and boring 230 linear feet of the 12-inch sewer main underneath the Burlington Northern Santa Fe (BNSF) railroad and Highway 16. Phase 2 Collection System Rehabilitation Project is separated into four different sections, Phase 2A, Phase 2B, Phase 2C, and Phase 2D. Phase 2A consists of replacing approximately 336 linear feet of existing 12-inch gravity sewer main with new 12-inch SDR 35 PVC sewer main; replacing 1,902 linear feet of existing 10-inch gravity sewer main with new 10-inch SDR 35 PVC sewer main; replacing 42 linear feet of existing 8-inch gravity sewer main with new 8-inch SDR 35 PVC sewer main; installing new manholes; and reconnecting sewer services. Phase 2A also includes open cut installation of approximately 29 linear feet of 10-inch PVC under Dry Creek. Phase 2B consists of relacing approximately 980 linear feet of existing 8-inch gravity sewer main with new 8-inch SDR 35 sewer main, installing new manholes, and reconnecting sewer services. Phase 2B also includes jacking and boring approximately 28 linear feet of 8-inch PVC carrier pipe in 16-inch steel casing under Dry Creek. Phase 2C consists of replacing approximately 1,940 linear feet of existing 8-inch gravity sewer main with new 8-inch SDR 35 PVC sewer main, installing new manholes, and reconnecting sewer services. Phase 2D consists of replacing approximately 1,160 linear feet of existing 8-inch gravity sewer main with new 8-inch SDR 35 PVC sewer main, replacing approximately 710 linear feet of existing 8-inch gravity sewer main with new 8-inch SDR 26 PVC sewer main, installing new manholes, and reconnecting sewer services. Est. Value Notes: $4,000,000.00 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing and must be received by no later than 5 p.m. local time on February 23, 2023. Written comments may be submitted to Gina Barry of Great West Engineering by mail at: 6780 Trade Center Avenue, Billings, MT 59101 or email at: gbarry@greatwesteng.com.

Bid Results

Water / Sewer

$8,101,820.00

Public - City

Site Work

38

18

12

10

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Multiple Contract Summary, Work Sequence, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Quality Control, Testing and Inspecting Services, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Final Cleaning, Closeout Submittals, Bonds, Warranties, Project Record Documents, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, High-Performance Coatings
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Rough Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Irrigation, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
19
All Active Projects
9
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 2, 2023

May 1, 2023

img_map_placeholder

Multiple Locations, Glendive, MT


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Phase 1 and 2 Collection System Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.