Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Cottage Grove, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.
Sanitary Sewer (Gravity), Sewer Force Main, Water Utilities, Roadway Lighting, Construction, Sidewalks/Curbs/Gutters, Concrete/Formed/Flatwork/Foundation, Electrical Installation/Construction, Fittings and Valves, ADA Curb Ramps, Erosion Control/Slope, Bank Stabilization, Fire Hydrant, Landscaping, Stormwater Improvements, Erosion Control - Temporary, Roadway Pavement Markings, Televising Sewers, Street/Road Pavement Marking, Utility Street Construction and Excavation, Sewer and Water Construction, Sitework/Excavating and Grading, Curbs, Paving (Trail Paving), Grubbing & Clearing, Signage, Waterlines, Paving (Highway, Road or Street). In general and pursuant to Minnesota Statutes, chapter 429, the work consists of the construction of water main improvements with approximately the following quantities: 114,031 CY Common Excavation 48,714 CY Common Embankment 13,000 SY Remove Bituminous Pavement 22,265 TN Aggregate Backfill (Modified) 57,400 TN Aggregate Base (Virgin) Class 5 11,000 TN Bituminous Pavement 4,600 LF 6"-18" Ductile Iron Pipe 620 LF Sanitary Sewer Structures 5,700 LF 8"-24" PVC Pipe Sewer 500 LF Drainage Structures 7,000 LF 12"-42"RC Pipe Sewer 21,900 SF Concrete Walk 10,500 LF Concrete Curb and Gutter 33 EA Lighting Units 73 EA Trees Along with temporary erosion control, turf establishment, signing, pavement markings, and related appurtenances. Additonal Description: All plan holders who order electronic proposals through will receive addenda as they are released; however, it is the Contractor's full responsibility to ensure they have received all addenda prior to the submittal of bids.
Bid Results
Roads / Highways
$6,774,653.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 26, 2022
June 27, 2022
Multiple Locations, Cottage Grove, MN
Related To This Project
Cottage Grove, MN
Bid Date: May 26 2022
Cottage Grove, MN
--
Cottage Grove, MN
Bid Date: Jun 09 2022
Cottage Grove, MN
Bid Date: May 09 2019
Cottage Grove, MN
Bid Date: Apr 07 2022
Cottage Grove, MN
Bid Date: Jun 10 2021
Cottage Grove, MN
Bid Date: Mar 24 2022
Cottage Grove, MN
Bid Date: May 13 2021
Cottage Grove, MN
Bid Date: Apr 14 2022
Cottage Grove, MN
--
Cottage Grove, MN
Bid Date: Apr 28 2022
Cottage Grove, MN
--
Cottage Grove, MN
Bid Date: Apr 29 2022
Cottage Grove, MN
Bid Date: Mar 31 2022
Cottage Grove, MN
Bid Date: Jan 18 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.