EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 28, 2022 at 8:00 PM

Updated October 1, 2024

Demolition, site work, paving and new construction of a mixed-use development in Livingston Manor, New York. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for the demolition of a water / sewer project; for the construction of a water / sewer project; and water / sewer project.

Furnish all labor, materials, equipment, and supervision for the construction of two (2) new campground shower buildings. Work includes but is not limited to clearing and grubbing; demolition of an existing building; construction of two (2) masonry shower buildings; paving, underground utilities, wastewater disposal systems and lift stations with associated general, plumbing, HVAC, electrical and sitework in accordance with the drawings and specifications. This phased project is separated Construction, Plumbing, Heating Ventilation and Air Conditioning, and Electrical Prime Contracts. There are required subcontracting provisions for General Contract, HVAC, Plumbing and Electrical Contracts. Individual checks for each project shall be made payable to the New York State Department of Environmental Conservation.Proposals will be accepted only from bidders who obtain the biddable Contract Documents directly from the Department. All proposals must be submitted on a printed paper version of the official Proposal Form 004113 and enclosed in a sealed envelope. Each proposal must be accompanied by a deposit or a Bid Bond Form 004313 in the amount of 5% of the bid. The Apparent Low Bidder will be required to submit a completed NEW YORK STATE VENDOR RESPONSIBILITY QUESTIONNAIRE FOR-PROFIT CONSTRUCTION (CCA-2) and M/WBE-EEO and SDVOB Utilization Plans within 24 hours and within five days, respectively, of being notified that they are the Apparent Low Bidder.Pursuant to State Finance Law, AA139-j and 139-k, this Invitation for Bid includes and imposes certain restrictions on communications between a Governmental Entity and an Offerer during the procurement process. Further information about these requirements, including a copy of the new lobbying law, can be found electronically The Contractor shall adhere to the NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION GUIDELINES REGARDING PERMISSIBLE CONTACTS DURING A PROCUREMENT AND THE PROHIBITION OF INAPPROPRIATE LOBBYING INFLUENCE. All correspondence and/or questions relating to this IFB should be directed to the Department's designated contacts listed below:David Walsh, Project Architect; Bruce Giddings, Electrical Engineer; Alex Kagan, Mechanical Engineer; Cameron Ross,Civil/Site Engineer; Randall Passmann, Design Supervisor; Tom Lincoln, Chief, Bureau of Design & Construction Appendix A of the contract contains Standard Clauses for all NYS Contracts; Appendix B contains Standard Clauses for Department of Environmental Conservation contracts including MBE and WBE requirements; Appendix C contains Standard Clauses for Ethics in all NYSDEC Contracts; and Appendix D contains Participation Opportunities for New York State Certified Service-Disabled Veteran Owned Businesses (SDVOB).Subcontractors will be required to complete the New York State Vendor Responsibility Questionnaire For-Profit Construction (CCA-2). There are maximum subcontracting limits as specified in the Supplemental Instructions to Bidders The design of this project was completed by the owner's in-house design professional

Bid Results

Water / Sewer

$48,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete, Precast Concrete Specialties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Manufactured Masonry, Manufactured Brick Masonry, Calcium Silicate Manufactured Brick Masonry
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Wood Treatment, Rough Carpentry, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping, Joint Protection, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Compartments and Cubicles, Partitions, Toilet, Bath, and Laundry Accessories
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Library Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Lighting, Interior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Earth Moving, Excavation and Fill, Excavation, Dewatering, Backfill, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting, Turf and Grasses, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons, Storm Drainage Utilities, Communications Utilities, Communications Distribution
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Solid and Mixed Materials Piping and Chutes, Bulk Materials Piping and Chutes
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Slings, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
297
Active Projects
177
Bidding Soon
2,489
All Active Projects
1,115
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 26, 2022

November 25, 2022

img_map_placeholder

231 Mongaup Pond Rd, Livingston Manor, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Mongaup Pond Campground - Shower Buildings - HVAC Contract

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.