Site work for a water / sewer project in South Amboy, New Jersey. Completed plans call for site work for a water / sewer project.

Re-Advertisement of Terminal Access and Berth Construction for the South Amboy Ferry Terminal; Contract No. 003202203, Township of South Amboy, County of Middlesex, NJ; 100% State Funded, UPC No: 10309, PE No: 6110108, CE No: 6620318, DP No: 22471. DEMO-DOOS-0021 (579) Estimated Completion Date on 12/31/2022 Letting ID: 22072101 Estimated Range for Information Purpose Only Range up to $5,000,000 SBE Goals for this Contract 3% Contractors Prequalified in one of these Work Types are eligible to bid this project: 40 or 43 Pursuant to N.j.s.a. 34:11-56.35(D), if the Commissioner of the Department of Labor and Workforce Development (Lwd Commissioner) Makes an Initial Determination That an Employer Has Violated the Provisions of P.l.1963, C.150 (C.34:11-56.25 Et Seq.) by Paying Wages at Rates Less Than the Rates Applicable Under That Act, the Lwd Commissioner May Immediately Issue a Stop-work Order to Cease All Business Operations at Every Site Where the Violation Has Occurred, and May Assess a Civil Penalty of $5,000 Per Day Against the Employer for Each Day It Conducts Business Operations in Violation of the Stop-work Order. If the Stop-work Order Is Issued Against a Subcontractor, the General Contractor May Terminate That Subcontractor From the Project in Accordance With N.j.s.a. 34:11-56.35(D). Forms Cr-266, Cr-273, Cr-272 and Cr-274 (Including All "Good Faith Effort" Documentation) Can Be Submitted Now (With the Bid) or Within 5 Days After Bid Opening via Email to Dot-cr.verifications@dot.nj.gov Pursuant to the Diane B Allen Equal Pay Act, N.j.s.a. 34:11-56.14.b., the Contractor Shall Provide to the Commissioner of the New Jersey Department of Labor and Workforce Development, Through Certified Payroll Records Required Pursuant to P.l.1963, C.150 (C.34:11-56.25 Et Seq.), Information Regarding the Gender, Race, Job Title, Occupational Category, and Rate of Total Compensation of Every Employee of the Employer Employed in the State in Connection With the Contract. The Contractor Shall Provide the Commissioner, Throughout the Duration of the Contract, With an Update to the Information Whenever Payroll Records Are Required to Be Submitted Pursuant to P.l.1963, C.150 (C.34:11-56.25 Et Seq.). Information Regarding the Diane B. Allen Equal Pay Act and Its Requirements May Be Obtained From the New Jersey Department of Labor and Workforce Development (Lwd) Website. Lwd Forms May Be Obtained From the Online. Pursuant to N.j.s.a. 52:25-24.2, No Corporation, Partnership, or Limited Liability Company Shall Be Awarded Any Contract Nor Shall Any Agreement Be Entered Into for the Performance of Any Work or the Furnishing of Any Materials or Supplies, Unless Prior to the Receipt of the Bid or Proposal, or Accompanying the Bid or Proposal of Said Corporation, Said Partnership, or Said Limited Liability Company There Is Submitted a Statement Setting Forth the Names and Addresses of All Stockholders in the Corporation Who Own 10 Percent or More of Its Stock, of Any Class, or of All Individual Partners in the Partnership Who Own a 10 Percent or Greater Interest Therein, or of All Members in the Limited Liability Company Who Own a 10 Percent or Greater Interest Therein, as the Case May Be. It Is the Policy of the New Jersey Department of Transportation That Small Business Enterprises, as Defined in N.j.a.c. 17:14-1.2 Et Seq., Shall Have the Maximum Opportunity to Participate in the Performance of This Contract. Bidders Are Required to Comply With the Requirements of N.j.s.a. 10:5-31 Et Seq. (P.l 1975, C. 127); N.j.a.c. 17:27-3.8. Pursuant to N.j.s.a. 19:44a-20.19, Contractors Must Provide a Certification and Disclosure of Political Contribution Form Prior to Contract Award. Pursuant to N.j.s.a. 52:32-44, Contractor Must Submit the Department of Treasury, Division of Revenue Business Registration of the Contractor and Any Named Subcontractors Prior to Contract Award or Authorization. Pursuant to N.j.s.a. 34:11-56.51, Contractors Must Be Registered With the New Jersey Department of Labor, Division of Wage and Hour Compliance at the Time of Bid. Minimum Wage Rates for This Project Shall Be as Specified in the "Prevailing Wage Determination of the New Jersey Department of Labor and Workforce Development" on File With This Department. The Attention of Bidders Is Directed to the Provisions Covering Subletting or Assigning the Contract to Section 108-prosecution and Completion of the New Jersey Department of Transportation Standard Specifications. The Entire Work Is to Be Completed on or Before the Estimated Completion Date. Dot Reserves Its Right to Reject Any and/or All Bids in Accordance With N.j.s.a. 27:7-30 and N.j.s.a. 27:7-33 NJDOT - Call Order 471 - Terminal Access and Berth Construction for the South Amboy Ferry Terminal - Rebid *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidders shall refer any questions regarding this bid in writing via letter or email to: Mark Rasimowicz, PE, City Engineer, 481 Spotswood Englishtown Road, Monroe Township, NJ 08831 or by email at Bids@CenterStateEngineering.com

Award

Water / Sewer

$3,145,679.00

Public - State/Provincial

Site Work

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Groundwater Treatment, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Tiling, Flooring, Terrazzo Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Directories, Signage, Plaques, Exterior Specialties, Flagpoles
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches, Other Furnishings, Site Furnishings, Bicycle Racks
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Turntables
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Common Work Results for Communications, Cable Services, Voice Communications, Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Driven Piles, Steel Piles, Timber Piles, Bored Piles, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Retaining Walls, Precast Concrete Retaining Walls, Planting, Plants, Shrubs, Trees, Planting Accessories, Planters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Guideways/Railways, Rail Tracks
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps, Lifts, Mobile Plant Equipment, Rail Vehicles, Locomotives
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
514
Active Projects
297
Bidding Soon
5,257
All Active Projects
2,233
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

March 27, 2023

img_map_placeholder

Raritan Bay, South Amboy, NJ

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Terminal Access and Berth Construction for the South Amboy Ferry Terminal

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.