BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Columbia, South Carolina. Completed plans call for the renovation of a detention facility.

Replace existing roof top heat pumps and gas packs and replace split system heat pumps as detailed on the drawings and in the specifications. Construction Cost Range: $1,000,00 to $1,400,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. All questions & correspondence concerning this Invitation shall be addressed to the A/E. A/E NAME: Mechanical Engineering Consulting Associates, Inc. A/E CONTACT: Kevin L. Stanley EMAIL: kstanley@mecainc.com TELEPHONE: (803) 765-9421 SCOPE A. The scope of this project is replacement of 2 split system heat pumps with new units as detailed on the drawings and specifications. A more detailed, but not exhaustive or inclusive list of scope requirements is shown below. The contractor shall review drawings and specifications carefully to determine the complete scope of the project and not depend solely on the description below. The following list is meant to serve as a general description of the scope of the project. B. Replace split system heat pumps as shown on the drawings and all items required for a complete and operating system. C. Modify/Add ductwork as herein specified and as indicated on mechanical drawings. D. Insulate all ductwork, piping, and equipment as herein specified and as indicated on mechanical drawings. Spring-type vibration isolators are not required. E. Outdoor refrigerant lines to be replaced complete. Insulate and enclose with weather-tight jacket. F. Start, test, adjust, balance and place into operation all systems via 3rd party T & B subcontractor under this contract. Extent of work for requirements indicated in specifications pertain to the systems and associated ductwork mains within the mechanical rooms. System air balance is to be accompanied with certified test forms as to obtained air quantities. Proper fan performance and coil discharge air temperature reading shall also be certified on test forms. G. Electrical power and controls power for the new mechanical systems. Confirm air handler and condensing unit power entry requirements and voltage for each prior to shop drawing phase and equipment order. H. Confirm thermostat locations with the agency prior to rough-in. Controls wiring shall be 120 volts or less. Provide transformers and relays as required to comply with this requirement. Conduit shall be steel conforming to the requirements of the Electrical Specifications, except as otherwise specified. I. RCI is the agency's 3rd party inspection company. Coordinate inspection timing with RCI and the agency. J. Smoke detectors to be installed upstream of the outside air duct connection to the return ductwork. Contact the existing fire alarm company to coordinate proper detector operation. K. Work must be performed AFTER normal work hours M-F 8:00am - 5:30pm, or on weekends. Coordinate work schedule with the Agency prior to commencing work

Award

Jails / Prisons

$1,159,454.00

Public - State/Provincial

Renovation

27

10

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
120
Bidding Soon
1,469
All Active Projects
637
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

February 23, 2023

April 24, 2023

February 28, 2024

img_map_placeholder

Multiple Locations, Columbia, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.