BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a bridge / tunnel in Newark, New Jersey. Design plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of September 25, 2023, per owner, we still have to finish the PE phase and the final design phase before graduating to construction. A design team has been identified. Central Avenue Bridge Over NJ Transit City Subway - Local Preliminary Engineering All comments and /or questions regarding the RFP's should be addressed in writing no later than May 31, 2022 to: Juan Feijoo, Acting Manager Div. Traffic and Signals feijooj@ci.newark.nj.us Tel: 973 733-3985 Fax: (973) 733-8880 City of Newark Department of Engineering 255 Central Avenue Newark, New Jersey 07103 Proposals are being solicited through a fair and open process in accordance with N.J.S.A. 19:44A 20.3, et seq. and as such, contractors are exempt from the limitations on making political contributions under that law. Further, for that reason, as well as because of a language in New Jersey's Annual Appropriations Act, refusal to disclose campaign contributions otherwise required by N.J.S.A. 19:44A-20.3et seq. and 19:44A-20.25 seq., will not adversely affect your consideration of award. The selection of Qualified Respondents is subject to the bidding or competitive contracting provisions of the Local Public Contracts Law, N.J.S.A. 40A:11-1 et seq. If ultimately awarded a contract, your company/firm will be required to comply with the requirements of P.L. 1975, c.127 (NJAC 17:27 et. seq.) The cost proposal should be in a separate sealed envelope, not to be part of the technical Request for Proposal document. You must create your own form; the City will not provide one. The City of Newark, Department of Engineering reserves the right to reject any and all RFP responses, and make the award based on the best interest of the City of Newark. The method of Contractor Selection has not been Determined at this time

Design

Bridges / Tunnels

$25,000,000.00

Public - City

New Construction, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
504
Active Projects
236
Bidding Soon
4,641
All Active Projects
2,130
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 28, 2024

img_map_placeholder

Central Ave, Newark, NJ


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.