BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Kinston, North Carolina. Completed plans call for site work for a water / sewer project.

PN- 20111.03 The waterlines in the Airport area of the North Carolina Global Trans Park (NCGTP) were installed in the 1940s. There are 770 feet of six (6) inch unlined lead joint cast iron waterlines, which will be replaced using 345 feet of eight (8) inch C-900 PVC waterlines. There are 2,574 feet of eight (8) inch unlined lead joint waterlines which will be replaced with 2,574 feet of eight (8) inch C-900 PVC waterlines, and there are 341 feet of unlined lead joint cast iron waterlines which will be replaced with 451 feet of twelve (12) inch ductile iron pipe waterlines. Many of the services are old lead services which will be replaced, and six (6) fire hydrants will be reconnected to the new waterline and two (2) fire hydrants will be replaced. Contractors are hereby notified that they must have the proper license under the State Laws governing their respective trades. Contractors must be licensed and general contractors must have license classification for Building Contractor. All bids will require a performance bond and a payment bond at time of contract execution (not required as part of the bid package). This project will require a bid bond as it is estimated to cost more than $200,000 and therefore will be formally bid. For Questions contact: Ethan Green Civil Engineer I (252) 939-3294

Award

Water / Sewer

$689,202.00

Public - City

Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
97
Active Projects
40
Bidding Soon
980
All Active Projects
421
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

August 1, 2022

img_map_placeholder

2780 Jetport Rd, Kinston, NC


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.