Published July 12, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Cumberland, Maryland. Completed plans call for the renovation of a educational facility.

Shall be submitted in strict accordance with the Instructions to Bidders and the Standard Form of Proposal attached to the Specifications The Contractor shall submit a Surety Bond or Certified Check in the amount of 5% of the total work for each project made out to the Owner. The security shall be issued by a surety licensed to conduct business in the State of Maryland. The Owner reserves the right to retain the security of the next two lowest bidders until the low bidder enters into the Contract or until sixty (60) days after bid opening. PERFORMANCE BOND AND PAYMENT BOND. Shall be in accordance with the AIA Document A701 2018 Article 7 in the amount of 100% of the value of the total work. The Contractor shall commence work under this Contract upon receipt by him of the Notice to Proceed, prosecute said work diligently, complete and have ready for use not later than September 30, 2022. The time stated for completion shall include final clean-up of the premises, removal of the contractor's equipment and supplies and receipt of the Use and Occupancy Permit. In case of failure on the part of the Contractor to complete the work within the time fixed in the contract or any extensions thereof, the Contractor shall pay the Owner, as fixed, agreed and liquidated damage, the sum $300.00 for each calendar day of delay. It is the goal of the Board of Education of Allegany County that Minority Business Enterprises be awarded a minimum of 10% of the costs of the project for which bids are being sought, and that such participation in those contracts or subcontracts resulting from the contracts not be subject to discrimination on the basis of political or religious opinion or affiliation, marital status, race, color, creed, or national origin, sex, age or any physical or mental handicap. PSC No. 01.035.23SR Board of Education of Allegany County reserves the right to accept or reject any/or all bids and to waive technicalities. Maximum subcontracting shall be 75% of the total contract value.

Post-Bid

Educational

$400,000.00

Public - County

Renovation

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Multiple Contract Summary, Work Sequence, Work Restrictions, Access to Site, Use of Site, Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Installer Qualifications, Quality Control, Field Quality Control Procedures, Temporary Facilities and Controls, Construction Facilities, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Project Record Documents
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Architectural Concrete, Concrete Finishing, Concrete Curing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Common Work Results for Masonry, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Gypsum Sheathing, Architectural Woodwork, Wood Frames
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping, Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Access Doors and Panels, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings, Common Work Results for Furnishings, Fabrics, Furnishings and Accessories, Portable Lamps, Lamps, Rugs and Mats, Runners, Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Dumbwaiters, Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, Sequence of Operations for HVAC Controls, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Cooling Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Power Conductors and Cables, Grounding and Bonding for Electrical Systems, Hangers and Supports for Electrical Systems, Raceway and Boxes for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Distribution Equipment, Wiring Devices, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Mowing, Bases, Ballasts, and Paving, Site Improvements, Screening Devices, Planting
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Utility Substations
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
242
Active Projects
140
Bidding Soon
1,745
All Active Projects
758
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 6, 2022

July 6, 2022

img_map_placeholder

909 Holland St, Cumberland, MD


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.