Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a water / sewer project in College Place, Washington. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
The Consolidated Irrigation District No. 14 (herein called the "Owner"), invites Bids for the construction of the Campbell Road Well House - 2022 project. The Work for this contract consists of the construction of a wood-framed, metal sided well house with electrical service, line shaft turbine well pump, column pipe, radio telemetry, and related improvements; surface restoration; and other miscellaneous work. All work performed on the project will be subject to all requirements related to Washington Prevailing Wage Rates for Public Works Projects, EEO, and Washington State Contracting Laws. All Contractors participating in the Work must be licensed in the State of Washington to conduct business. This project is funded in part through the Washington State Public Works Board program with state funds. The Work shall be substantially complete by February 28, 2023. The building envelope and underground piping needs to be completed and ready for electrical and well pump equipment by December 15, 2022. Each bid on the project must be submitted on the prescribed form and accompanied by a certified check or bid bond payable to the Owner in an amount not less than 5 percent of the amount bid. The Successful Bidder will be required to furnish the necessary additional bonds for the faithful performance of the contract as prescribed in the Contract Documents. The Owner may reject any bid not in compliance with all prescribed requirements and may reject for good cause any and all bids upon finding that it is in the public interest to do so. The Owner is an Equal Opportunity and Affirmative Employer. A pre-bid conference will be not be held for this project. Est. Value Notes: $800,000 - $900,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work shall be substantially complete by February 28, 2023.
Bid Results
Water / Sewer
$1,041,009.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2022
July 4, 2022
S Campbell Rd, College Place, WA
Related To This Project
College Place, WA
--
College Place, WA
Bid Date: Jan 04 2023
College Place, WA
--
College Place, WA
--
College Place, WA
--
College Place, WA
--
College Place, WA
--
College Place, WA
--
College Place, WA
--
College Place, WA
--
College Place, WA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.