BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 16, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a water / sewer project in College Place, Washington. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The Consolidated Irrigation District No. 14 (herein called the "Owner"), invites Bids for the construction of the Campbell Road Well House - 2022 project. The Work for this contract consists of the construction of a wood-framed, metal sided well house with electrical service, line shaft turbine well pump, column pipe, radio telemetry, and related improvements; surface restoration; and other miscellaneous work. All work performed on the project will be subject to all requirements related to Washington Prevailing Wage Rates for Public Works Projects, EEO, and Washington State Contracting Laws. All Contractors participating in the Work must be licensed in the State of Washington to conduct business. This project is funded in part through the Washington State Public Works Board program with state funds. The Work shall be substantially complete by February 28, 2023. The building envelope and underground piping needs to be completed and ready for electrical and well pump equipment by December 15, 2022. Each bid on the project must be submitted on the prescribed form and accompanied by a certified check or bid bond payable to the Owner in an amount not less than 5 percent of the amount bid. The Successful Bidder will be required to furnish the necessary additional bonds for the faithful performance of the contract as prescribed in the Contract Documents. The Owner may reject any bid not in compliance with all prescribed requirements and may reject for good cause any and all bids upon finding that it is in the public interest to do so. The Owner is an Equal Opportunity and Affirmative Employer. A pre-bid conference will be not be held for this project. Est. Value Notes: $800,000 - $900,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Work shall be substantially complete by February 28, 2023.

Bid Results

Water / Sewer

$1,041,009.00

Public - City

New Construction, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
45
Active Projects
31
Bidding Soon
271
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

July 4, 2022

Project location map

S Campbell Rd, College Place, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.