Published June 30, 2022 at 8:00 PM

Updated February 27, 2024

Site work, paving and renovation of a mixed-use development in Tyler, Texas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for the renovation of a water / sewer project; and water / sewer project.

Project No - 21028 Sealed bids will be for furnishing all necessary materials, equipment, superintendence, and labor for construction of the following being improvements for the City of Tyler, Texas: City of Tyler Bid Number: 22-032 Project Name: Wastewater Treatment Plant Chlorination/Dechlorination Improvements The project includes: Replacement of chlorine and sulfur dioxide chemical storage and feed systems, installation of water supply improvements, installation of an emergency gas scrubber, replacement of gates, enclosure of chlorine storage area, replacement of doors, windows, and lighting, paving and site improvements, and associated appurtenances. Work under this contract includes: Removal and replacement of existing chlorine and sulfur dioxide chemical storage and feed systems at the City's Southside Wastewater Treatment Plant. Installation of water supply improvements to chlorine feed room for chlorine solution development and chlorine residual analysis at the City's Southside Wastewater Treatment Plant. Installation of an emergency scrubber at the City's Southside Wastewater Treatment Plant. Removal and replacement of chlorine contact chamber gates at the City's Southside Wastewater Treatment Plant. Enclosure of the existing chlorine storage area at the City's Southside Wastewater Treatment Plant including new concrete masonry block and brick veneer walls. Removal and replacement of existing windows, doors, and lights throughout the chlorination/dechlorination building at the City's Southside Wastewater Treatment Plant. Site improvements at the City's Southside Wastewater Treatment Plant including asphalt driveway, all-weather access rock driveway, concrete sidewalks, concrete pavement, concrete foundation for emergency scrubber, and associated appurtenances. Removal and replacement of existing chlorine and sulfur dioxide chemical storage and feed systems at the City's Westside Wastewater Treatment Plant. Installation of water supply improvements to chlorine feed room for chlorine solution development and chlorine residual analysis at the City's Westside Wastewater Treatment Plant. Removal and replacement of chlorine contact chamber effluent weir at the City's Westside Wastewater Treatment Plant. Site improvements at the City's Westside Wastewater Treatment Plant including asphalt driveway, concrete sidewalks, concrete pavement, drainage improvements, and associated appurtenances. Questions concerning this project shall be submitted 72 hours prior to bid opening through the Q&A Portal Estimate: $2,250,000.00 - $2,750,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Liquidated Damages $1,000.00 Calendar Days: 240 1. Removal and replacement of existing chlorine and sulfur dioxide chemical storage and feed systems at the City's Southside Wastewater Treatment Plant. 2. Installation of water supply improvements to chlorine feed room for chlorine solution development and chlorine residual analysis at the City's Southside Wastewater Treatment Plant. 3. Installation of an emergency scrubber at the City's Southside Wastewater Treatment Plant. 4. Removal and replacement of chlorine contact chamber gates at the City's Southside Wastewater Treatment Plant. 5. Enclosure of the existing chlorine storage area at the City's Southside Wastewater Treatment Plant including new concrete masonry block and brick veneer walls. 6. Removal and replacement of existing windows, doors, and lights throughout the chlorination/dechlorination building at the City's Southside Wastewater Treatment Plant. 7. Site improvements at the City's Southside Wastewater Treatment Plant including asphalt driveway, all-weather access rock driveway, concrete sidewalks, concrete pavement, concrete foundation for emergency scrubber, and associated appurtenances. 8. Removal and replacement of existing chlorine and sulfur dioxide chemical storage and feed systems at the City's Westside Wastewater Treatment Plant. 9. Installation of water supply improvements to chlorine feed room for chlorine solution development and chlorine residual analysis at the City's Westside Wastewater Treatment Plan 10. Removal and replacement of chlorine contact chamber effluent weir at the City's Westside Wastewater Treatment Plant. 11. Site improvements at the City's Westside Wastewater Treatment Plant including asphalt driveway, concrete sidewalks, concrete pavement, drainage improvements, and associated appurtenances.

Bid Results

Water / Sewer

$3,661,620.00

Public - City

Paving, Renovation, Site Work

51

28

6

8

Subscribe For Documents

105 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
34
Bidding Soon
903
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.