Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, renovation and addition to a mixed-use development in Fletcher, North Carolina. Completed plans call for the addition of a 275,000-square-foot, two-story above grade transportation facility; for the demolition of a transportation facility; for the renovation of a transportation facility; and for site work for a transportation facility.
As of May 6, 2022, The Baggage Handling System scope has been revised and re-issued as a part of Bid Package #2, which is the second of three anticipated work packages associated with this project. This project expands and modernizes the existing single story, seven-gate terminal building to a two-story building with a minimum of 12 gates. The overall size of the structure expanded from approximately 115,000 SF to 275,000 SF. RFQ FORM LINK: tinyurl.com/yc6jcppz Work Package #2 - Central Energy Plant, Civil, PBB, BHS Scope includes but is not limited to: Site Demolition, Earthwork, Site Utilities, Asphalt Paving, Concrete Paving, Pavement Markings, Fencing, Turnkey Concrete, Precast Concrete, Masonry, Structural & Miscellaneous Steel, Rough Carpentry, Roofing, Caulking, Waterproofing, & Firestopping, Doors, Frames, and Hardware, Overhead Doors, Glass & Glazing, Drywall, Ceilings, Tile, Carpet & Resilient Flooring, Epoxy Flooring, Painting, Building & Miscellaneous Specialties, Passenger Boarding Bridges, Fire Protection, Plumbing, Mechanical, Electrical, Low Voltage, Security, Fire Alarm, Aggregate Piers, and Baggage Handling Systems. PLEASE NOTE: -Each work package requires prequalification. Only contractors who have prequalified will be allowed to price each work package. -The project's second purchasing package, entitled *Bid Package #2*, is scheduled to be issued late February 2022, and it is anticipated bids to be due in early April 2022. -Bidding information will only be shared with contractors who are prequalified to bid. Overall project is approximately $200+ million. Project value of this Work Package is approximately $47,000,000. Anticipated Bid Date: Work Package 2 - CEP, Civil, PBB BHS - April 2022 ($47,000,000) Anticipated Bid Date: Work Package 3 - Demo, Structure, Foundations, Vert Transportation - August 2022 ($97,000,000) Anticipated Bid Date: Work Package 4 - Exterior Envelope, Misc Metals- August 2022 ($23,000,000) Anticipated Bid Date: Work Package 5 - MEP, Interiors - August 2022 ($38,000,000) Project commenced construction December 2021. If you have any questions about the Pre-Qualification form, you can reach out to Tanner McClellan, Project Engineer with Hensel Phelps at TMcLellan@HenselPhelps.com. Any questions regarding the scopes or bidding, please direct them to Matt Recinos, Senior Estimator, at MRecinos@HenselPhelps.com PLEASE NOTE: NC statutes require all first-tier trade partners to be pre-qualified or your proposal will not be considered. Thus, if you have not yet completed and submitted the pre-qualification questionnaire, please do so immediately. The pre-qualification form can be accessed via the following link: tinyurl.com/yc6jcppz
Post-Bid
Transportation Terminals
$47,000,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 17, 2022
June 6, 2022
61 Terminal Dr, Fletcher, NC
Related To This Project
Fletcher, NC
Bid Date: Apr 19 2022
Fletcher, NC
--
Fletcher, NC
--
Fletcher, NC
--
Fletcher, NC
Bid Date: Sep 23 2022
Fletcher, NC
Bid Date: Feb 09 2023
Fletcher, NC
Bid Date: Jun 22 2023
Fletcher, NC
--
Fletcher, NC
Bid Date: May 17 2022
Fletcher, NC
Bid Date: Oct 19 2021
Hillsborough, NC
Bid Date: May 26 2021
Hillsborough, NC
--
Chapel Hill, NC
Bid Date: Oct 15 2019
Hillsborough, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.