BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 26, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Houston, Texas. Completed plans call for site work for a water / sewer project.

The Developer, Lennar Homes of Texas Land and Construction, Ltd., will be the Payor for the contract for the Owner. This portal will be updated periodically with Addenda, Plan Holders List, additional reports or other information relevant to bidding the project. Lennar Homes of Texas Land and Construction, Ltd. on behalf of Kaufman County Municipal Utility District No. 9 reserves the right to reject any and all bids. The Successful Bidder, if any, will be the responsible Bidder which in the Board's judgment will be most advantageous to the District and result in the best and most economical completion of the Project. (Texas Water Code 49.273) Bid security in the form of bid bond or cashier's check payable to Lennar Homes of Texas Land and Construction, Ltd. on behalf of Kaufman County Municipal Utility District No. 9 in an amount not less than five percent (5%) of the Bid submitted, must accompany each Bid. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this Bid and/or Contract and bidder/contractor agrees that the Contract can be terminated if the bidder/contractor knowingly or intentionally fails to comply with a requirement of that subchapter. Bidder/Contractor declares that it has not received from a governmental body a notice of noncompliance with a provision of Subchapter J, Chapter 552, Texas Government Code, or, if such notice has been received, bidder/contractor has taken adequate steps to ensure future compliance with such subchapter and has provided or upon request will provide documentation of same. Eastland Phase 2B and 2C is located within the City of Crandall ETJ, Kaufman County, Texas. Eastland Phase 2B contains 106 residential lots. Eastland Phase 2C contains 131 residential lots. Eastland Phase 2B Paving Improvements consist of approximately 11,282 SY of 6" reinforced concrete paving, and approximately 7,129 SF of concrete sidewalk. Master Paving Improvements consist of approximately 8,595 SY of 6" reinforced concrete, and approximately 19,130 SF of concrete sidewalk (5' and 6'). Eastland Phase 2C Paving Improvements consist of approximately 12,600 SY of 6" reinforced concrete paving, and approximately 2,972 SF of concrete sidewalk. Master Paving Improvements consist of approximately 2,598 SY of 6" reinforced concrete, and approximately 6,897 SF of concrete sidewalk (5' and 6'). Eastland Phase 2B Utility Improvements consist of approximately 3,400 LF of residential sanitary gravity sewer, 3,670 LF of residential waterline, and 2,540 LF of residential storm sewer. Master Utility Improvements consist of approximately 950 LF of water, 980 LF of in phase storm, and 815 LF out of storm. Eastland Phase 2C Utility Improvements consist of approximately 3,825 LF of residential sanitary gravity sewer, 1,010 LF out of phase sanitary gravity sewer, 4,195 LF of waterline, and 1,400 LF of storm sewer

Bid Results

Water / Sewer

$3,578,747.00

Public - County

Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
389
Active Projects
199
Bidding Soon
3,763
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.