BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, asbestos abatement and renovation of a mixed-use development in Tulelake, California. Completed plans call for the demolition of a hospitality development; for the renovation of a hospitality development; for site work for a sidewalk / parking lot; water / sewer project; hospitality development; and for asbestos abatement for a hospitality development.

Demolition of the existing Clyde Hotel (315 Main Street) and Mix Tienda (319 Main Street) buildings, including removal of existing foundations, steps, sidewalks, disconnection of existing utilities and import backfill material. Asbestos abatement of vinyl floor tiles / black mastic and sheet flooring, and pipe wrap on exterior piping. Abatement of interior and exterior lead- containing painted surface coatings. Repair of exterior wall at 325 Main Street once Mix Tienda is demolished.Questions may be emailed to vream@adkinsengineering.com. Contract completion time will be 60 days from issuance of Notice to Proceed.The Owner is an equal opportunity employer. Minority, Women and Emerging Small Businesses are encouraged to Bid. Minority Women and Emerging Small Businesses should indicate they are a minority on the Plan Holders list. Bid security shall be furnished in accordance with the Instructions to Bidders.The Work to be performed under this Contract is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended. The purpose of Section 3 is to ensure that employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3 shall, to the greatest extent feasible, be directed to low- and very-low income persons, particularly persons who are recipients of HUD assistance for housing. The Engineer's Estimate is $650,000.00-$750,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Hotel / Motel

$702,000.00

Public - City

Asbestos Abatement, Demolition, Renovation, Site Work

3

19

4

7

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
2
Bidding Soon
55
All Active Projects
19
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

July 1, 2022

img_map_placeholder

Main St, Tulelake, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.