BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 18, 2022 at 8:00 PM

Updated February 18, 2025

Site work for a civil project in Ontario, California. Completed plans call for site work for a road / highway.

The City of Ontario's Municipal Utilities Company (OMUC) is implementing water system capital improvements identified in OMUC's Water Master Plan. The construction will be within the City of Upland along 8th Street, between San Antonio Avenue and South Fern Avenue. The work under this contract consists of installation of approximately 85 linear feet of 60-inch diameter steel casing, approximately 60 linear feet of 48-inch diameter steel casing, approximately 200 linear feet of 30-inch diameter CML&C WSP and approximately 1,290 linear feet of 36-inch diameter CML&C WSP potable water transmission main; ground improvements by permeation grouting, including subsurface investigations, installation of water appurtenances connections to existing pipelines; pipeline abandonments and removals, temporary water supply line (highline); implementation of traffic control during construction, pavement repair, grinding and overlays, and striping restoration as described in the Plans and Specifications for Project. For the purposes of differentiating the City of Ontario (Owner) and the City of Upland (project jurisdiction), these Technical Specifications and the Contract Drawings refer to the Owner, the City of Ontario's Municipal Utilities Company as the OMUC Phase 1 used throughout these Contract Documents, including the Plans refers to an existing 30-inch diameter transmission water main along San Antonio Avenue, which was constructed in 2021. Phase 2 is this Project, which connects to Phase 1 and continues east terminating at Fern Avenue and 8th Street intersection. Note, this Project does not consist of two Phases. References to Appendices throughout these Contract Documents, including the Plans shall mean Appendix A through M, accordingly. OMUC is implementing water system capital improvements identified in OMUC's Water Master Plan. The construction will be within the City of Upland along 8th Street, between San Antonio Avenue and South Fern Avenue. The work under this contract consists of installation of approximately 85 linear feet of 60-inch diameter steel casing, approximately 60 linear feet of 48-inch diameter steel casing, approximately 200 linear feet of 30-inch diameter CML&C WSP and approximately 1,290 linear feet of 36-inch diameter CML&C WSP potable water transmission main; ground improvements by permeation grouting, including subsurface investigations, installation of water appurtenances connections to existing pipelines; pipeline abandonments and removals, temporary water supply line (highline); implementation of traffic control during construction, pavement repair, grinding and overlays, and striping restoration Online Q&A Yes Q&A Deadline 05/30/2022 11:00 AM (PDT) Completion of Work $5,000 for each and every calendar day of delay in completing the Work beyond the time prescribed in the Contract Documents for finishing the Work, as Liquidated Damages and not as a penalty or forfeiture. Water Shutdowns $2

Bid Results

Water / Sewer

$7,994,702.00

Public - City

Site Work

17

19

16

5

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
538
Active Projects
274
Bidding Soon
3,747
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 16, 2022

September 30, 2022

Project location map

8th St, Ontario, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.