Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 28, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a municipal facility in Washington, District of Columbia. Completed plans call for the renovation of a municipal facility.
The Contractor shall furnish all supervision, labor, materials, and equipment needed to complete interior improvements at the Smithsonian Institution's Capital Gallery Administrative Headquarters located on the 3rd and 4th Floors of the East Tower at 600 Maryland Avenue SW, Washington DC The Work includes, but is not limited to: o The Tenant Fit Up of approximately 35,000 square feet of existing 3rd floor Office Suite with limited demolition; partition modifications; new ceiling tile, wall, and floor finishes; miscellaneous cabinetry. o Remodeling of the South and North Male and Female Toilet Rooms for ADA compliance with new fixtures and finishes and associated plumbing. o Demolition of plumbing fixtures and piping in existing pantries and addition of new plumbing fixtures and piping in two new pantries and mother's room o Remodeling of the South and North LAN Rooms with new Communication and Security equipment. o Limited HVAC alterations and addition of three new ceiling units; one new unit per LAN Rom and one conference room unit. o Modification to HVAC controls for central AHU's and floor-mounted perimeter units. o Limited Electrical alterations and additions of power, mechanical equipment, and lighting branch circuits; o new lighting fixtures and lighting control system and devices; replacement and consolidation of existing panelboards; new power and ground bus in LAN room. o Fire Alarm - Modify existing fire alarm system to meet new tenant fit-out and NFPA 72 codes for audibility. Installation of smoke detection throughout public and common areas. o Sprinkler - Providing all new quick response heads throughout and modifying existing sprinkler system to meet new tenant fit-out. All work is to be completed by December 12, 2022. To reduce the possibility that a balance report is rejected, we suggest the Test Adjust Balance Contractor submit a sample report in advance of its work for Boston Properties' approval.
Post-Bid
Municipal
$400,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 3, 2022
July 4, 2022
600 Maryland Ave SW, Washington, DC
Related To This Project
Washington, DC
Bid Date: Jul 08 2022
Washington, DC
Bid Date: Jul 28 2022
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: Jul 29 2022
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
--
Washington, DC
Bid Date: Jun 29 2022
Washington, DC
--
Washington, DC
Bid Date: Jul 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
