BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 26, 2023 at 7:00 PM

Updated February 28, 2024

Site work, paving and new construction of a civil project in Lakeway, Texas. Completed plans call for the construction of a bridge / tunnel; for site work for a road / highway; and for paving for a road / highway.

As of January 25, 2023, construction is underway, however, an timeline for construction has not been established as there have been issues with securing materials. A. This section describes the various Project related meetings which will be held on routine schedule throughout the duration of the Project. B. The CONTRACTOR shall attend all Project related meetings as indicated hereafter. The CONTRACTORs representative, at a minimum, shall include his Project Manager and Construction Site Superintendent. Other CONTRACTOR's representatives may attend Project related meetings, however, a limit of four representatives at any one meeting is mandatory unless the ENGINEER approves a larger number. C. The CONTRACTOR shall provide all pertinent reports, copies of reports, etc., for each meeting as may be required by this or other sections of the Contract. Lakeway Sculpture Garden. Site improvements include installation of a new trail including a pedestrian bridge over Hurst Creek, in addition to all associated grading, drainage, pavement striping, and signage improvements, including all inspections and related incidentals. The City will convey important bidding and other administrative requirements to the Bidders and receive questions regarding any ambiguities in the contract documents or associated construction plans. Any document changes discussed at the meeting are not final until/unless they are addressed in a formal written addenda Questions regarding the Invitation to Bid shall be directed to: Rey Gonzalez P E Project engineer email: rg@huittzollars.com *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Bridges / Tunnels

$188,723.00

Public - City

New Construction, Paving, Site Work

16

10

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
311
Active Projects
152
Bidding Soon
2,645
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 9, 2022

October 10, 2022

Project location map

Cross Creek & Lohmans Crossing Rd, Lakeway, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.