Site work and paving for a mixed-use development in Hayward, California. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project Duration: 280 Work Days Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10% The work includes, in general, the furnishing of labor, materials, and equipment for the construction of new sanitary sewer lines throughout the City, including, but not limited to replacing existing sewer pipes with approximately 17,800 linear feet of new pipes by open cut; approximately 3,100 linear feet new pipes by pipe bursting; approximately 690 linear feet of new pipes by pipe reaming; and rehabilitating approximately 570 linear feet of existing pipes by cured in place pipe (CIPP); restoring and reconnecting all affected sanitary sewer service lines (laterals); removing and replacing sewer manholes; modifying existing sewer manholes; and reconstructing approximately 110 ft of retaining wall and access road. The work also includes one (1) location requiring trenchless installation of steel casing for railroad, BART, and flood control channel crossings, cleaning and video inspection of sanitary sewer pipes, wastewater flow control and bypass pumping, dewatering, shoring, traffic control, utility locating, potholing, public notification, restoration of public and private surface improvements (including but not limited to pavement, sidewalk, curb and gutter, fences, and landscaping), and all incidental items not mentioned above, but are required by the Contract Drawings, Standard Specifications, Technical Specifications, or these Special Provisions. License Type Required: Class A, or C-34 Engineer's Estimated Cost: $13,600,000 to $13,600,000

Award

Water / Sewer

$11,087,925.00

Public - City

Paving, Site Work

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Value Analysis, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Welded Wire Fabric Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Flooring, Carpeting, Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Retaining Walls, Irrigation, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Assembly and Testing Equipment, Applicators
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
82
Bidding Soon
2,002
All Active Projects
811
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

August 15, 2022

img_map_placeholder

Multiple Locations, Hayward, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.