BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Salt Lake City, Utah. Completed plans call for the construction of a 280,000-square-foot educational facility.

As of August 16th, 2022 this project will begin in the next few weeks. The Impact and Prosperity Epicenter at the University of Utah will be a new multidisciplinary hub for social impact, community engagement, and enterprise, empowering social entrepreneurs and organizations. The facility will foster a growing network of social impact practitioners acting as a nerve center that equips them with the knowledge, experience, and vision required to change the world. The facility brings the Sorenson Impact Center and the Business, Health, and Prosperity Center together under one roof, providing unique opportunities to support each other in their shared mission to change thought, improve practice, and enrich the lives of students, faculty, and partners. The housing component of the building, while applying configurations typical on campus, sustains a different potential than the typical campus housing. It is a key component in the interchange between living and working, doing, and learning. Given the schedule, complexity and quality expectations of the project, the project team desires to engage with a number of Design/Assist Subcontractors including Mechanical (HVAC and Plumbing), and Electrical. The Owner of this project along with MHTN Architects and Okland Construction, have begun planning and design for this new facility. It is expected that the Design Assist Subcontractor will provide comprehensive construction and administrative services to successfully meet the needs of the project and initiatives of the U of U leadership groups.

Post-Bid

Educational

$59,712,303.00

Public - State/Provincial

New Construction, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
28
Bidding Soon
560
All Active Projects
258
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2022

August 31, 2022

img_map_placeholder

1701 Student Life Way, Salt Lake City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.