Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a playground / park / athletic field in Quebec, Quebec. Completed plans call for the renovation of a playground / park / athletic field.
Reference number : 1602396 Review Title : Boiler installation work, building automation and replacement of the electrical entrance (Construction) / Scheduled maintenance of building automation components (Maintenance) at 31, rue Mont-Carmel, Quebec (Qc) G1R 4A6 Deadline for receipt of complaints: 2022-05-16 Submission sent electronically accepted: Yes, in a single submission document Title of the contract: Boiler installation work, building automation and electrical input replacement (Construction) / Planned maintenance of building automation components (Maintenance) Building address: 31, rue Mont-Carmel, Quebec (Quebec) G1R 4A6 The Société québécoise des infrastructures (hereinafter the Société) is issuing a public call for tenders for construction work and maintenance services for the contract mentioned in the title. All bidders must comply with the requirements contained in the contract documents. These can only be obtained through the SÉAO electronic call for tenders system at www.seao.ca or by calling 514 856-6600 for residents of the Montreal region and at toll free 1 866 669-7326 for residents living outside. Caution : Note that only the documents required by the Company under the terms of this call for tenders must be submitted with the tender, so as to avoid any situation that would result in the tender being restrictive or conditional. Construction work : The work required under this invitation to tender must be completely completed within 25 weeks ( including public holidays, construction holidays and the time required for the supply of materials/equipment) from the date of the authorization to start work. The probable start date of the work is between June 6 and July 6, 2022. Maintenance : The services covered by this call for tenders are required for a period of 36 months , without the option of renewal, from the date of acceptance with reservations of all the construction work of contract 44528677. TRANSMISSION OF COMPLAINTS All complaints made to the Société under section 21.0.4 of the Act respecting contracting by public bodies (CQLR, chapter C-65.1) must be received at complaint@sqi.gouv.qc.ca , no later than the deadline set for receipt of these as indicated in the Additional Instructions . INFORMATION Tenderers who wish to receive clarifications concerning the call for tenders must communicate in writing to the e-mail address designated below, taking care to mention the contract number, and this, maximum three working days before the date . and the deadline for receipt of tenders . If such a request for clarification is received two working days or less before the deadline date and time for receipt of tenders, the Company reserves the right not to consider it. Information concerning the contractual documents: Direction : Construction Contracts and Operations Support Branch E-mail : infosoumission9@sqi.gouv.qc.ca RESERVE The Company reserves the right not to accept any of the submissions received. Performance and Material Bond 50% is required. award is subject to final approval.
Award
Playgrounds / Parks / Athletic Fields
$473,670.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 27, 2022
June 9, 2022
31 R. Mont-Carmel, Quebec, QC
Related To This Project
Quebec, QC
Bid Date: Jan 31 2023
Quebec, QC
Bid Date: May 30 2022
Quebec, QC
Bid Date: Jun 02 2022
Quebec, QC
Bid Date: Jun 02 2022
Quebec, QC
Bid Date: Jun 02 2022
Quebec, QC
Bid Date: May 06 2022
Quebec, QC
Bid Date: Jan 31 2023
Quebec, QC
Bid Date: Jun 01 2022
Quebec, QC
Bid Date: Oct 25 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.