BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Demolition, site work, paving, outdoor lighting and addition to a mixed-use development in Cleveland, Ohio. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; water / sewer project; for the addition of a parking garage; for the demolition of a parking garage; and parking garage.

This plan proposes to demolish three existing buildings, several segmental block retaining walls, various utilities, pavement areas and trees. One existing building, the refuse garage (aka Refuse Truck Parking facility), will remain in place. This plan proposes a building addition to the existing refuse garage building remaining in place. The refuse garage will receive improvements to its existing conditions. Included are new pavement, site lighting, signage, landscaping, fencing and parking areas throughout the site. A debris drop-off area for city residents, a segmental block retaining wall and concrete/asphalt debris storage areas in a new storage yard facility. Various new underground utilities including water, storm sewer, sanitary sewer, gas, electric, and fiber to support the existing and proposed building. Stormwater management for the property will be handled by an underground detention facility adjacent to the Berea Road Right of Way. The base bid requires that the Contractor maintain City operations throughout the entire construction. 12920 Berea Road - Cleveland, Ohio 44111. Pricing for Alternate A includes the site being vacated by the City and residents to permit the Contractor total control of the site. The Contractor shall provide the number of calendar days to complete the Work specified in the plans and specifications on the provided form. Bidders can visit the site (12920 Berea Road - Lakewood, Ohio 44107) Monday through Friday from 7 AM to 3 PM. Visitors need to check-in at the entrance.

Bid Results

Parking Garage

$7,650,001.00

Public - City

Addition, Demolition, Outdoor Lighting, Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
140
Active Projects
100
Bidding Soon
1,113
All Active Projects
433
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2022

July 4, 2022

img_map_placeholder

12920 Berea Rd, Cleveland, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.