Demolition, site work and new construction of a water / sewer project in Norco, California. Completed plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; and for site work for a water / sewer project.

In general, the project consists of replacing the existing Grulla Sewage Lift Station with a new Grulla Sewage Lift Station (Station). In general, the lift station work will include constructing a new submersible lift station with wet well, submersible pumps, abovegrade discharge piping, air entrainment system, connection sewer and force main, motor control center (MCC), potable water service, security fencing, site improvements, and demolition of the existing packaged station and associated electrical panels (Bid Schedule I, Bid Items 101 through 119). The work will also include construction of the Grulla Storm Drain, which consists of approximately 310 LF of storm drain, 25 LF of sewer, and associated manholes, basins, and transition structures (Bid Schedule II, Bid Items 201 through 232). Award will be based on the total of both Bid Schedules (i.e. Bid Items 101 through 119 and 201 through 232). There are 180 working days allowed to complete this project from Notice to Proceed. Please note that Notice to Proceed will be granted in accordance with Special Provision 6-1 with the understanding that Notice to Proceed will coincide with mobilization. Notice to Proceed will not be granted until the procurement schedule for major equipment has been established to the satisfaction of the City Engineer. Also, due to long lead times in procuring MCC equipment and appurtenances the Contractor shall obtain these items prior to the issuance of a Notice to Proceed. Liquidated damages may be assessed at $1,000.00 per working day. The City's request for bids and proposals, bid results, and notices of an award are obtained through the City of Norco Vendor Portal, www.norco.ca.us/bid All necessary forms, specifications and other bid documents may be viewed and downloaded electronically. Businesses who have registered in the Vendor Portal will receive email notices when a new request for bid or proposal relevant to their line of business is issued. Any interested party may view the City's solicitations, as well as the bid results and final notices of award, by logging into the Vendor Portal and using the search features to locate the items of interest. The City reserves the right to reject any or all bids and to waive any irregularity or informality in any bid to the extent permitted by law. The Contractor must possess a valid Contractor's License issued by the Contractors State Board at the time the bid is submitted. The class of license shall be applicable to the work specified in the contract. The successful bidder shall be licensed according with the provisions of the Business and Professional Code and shall possess a Class A license at the time this contract is awarded. The successful Contractor and his/her subcontractors will be required to possess business licenses from the City of Norco. Construction shall be completed within 180 working days after the Notice to Proceed is issued. Online Q&A Yes Q&A Deadline 09/19/2024 12:00 PM (PDT)

Award

Water / Sewer

$2,378,635.00

Public - City

Demolition, New Construction, Site Work

30

18

38

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Design Data, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Curing
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Decorative Metal
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Thermal Protection
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Other Specialties, Scales
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
140
Bidding Soon
2,331
All Active Projects
1,024
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2024

November 27, 2024

img_map_placeholder

Grulla Ct, Norco, CA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Grulla Lift Station Replacement Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.