Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Mora, Minnesota. Completed plans call for site work for a road / highway; and road / highway.
SAP 033-620-011 and 033-630-003 Kroschel Township SAP 033-617-010 and 033-605-022 Grass Lake Township KCP 22-04 Brunswick Township ATP 22-01 Mora MN area. Project bid documents must be downloaded from QuestCDN which will add your company to the Planholder List and allow access to vBid online bidding for the submittal of your bid (which is required for this project). SAP 033-620-011 - (2.02 mi.) The project is located 25 miles Northeast of Mora MN. The work consists of Bituminous surfacing, Aggregate Shouldering, and Striping, Full Depth Reclamation, and sign installation. among other things. The major quantities of work are: 1 L.S. Mobilization; 1 L.S. Maintenance and Restoration of Haul Roads; 30,000 SY Full Depth Reclamation; 1,249 CY Shoulder Base Aggregate (LV), Class 1; 1,429 Gallons Bituminous Material for Tack Coat; 3,364 Tons Type SP 9.5 Wearing Course Mixture (2,C); 3,364 Tons Type SP 9.5 Non-wearing Course Mixture (2,C); 4 Each Mailbox Support; 1 L.S. Traffic Control; 26,830 L.F. 4" traffic marking lines paint, among other things SAP 033-630-003 - (1.20 mi.) The project is located 25 miles Northeast of Mora MN. The work consists of Bituminous surfacing, Aggregate Shouldering, and Striping, Full Depth Reclamation, and sign installation. among other things. The major quantities of work are: 1 L.S. Mobilization; 1 L.S. Maintenance and Restoration of Haul Roads; 16,996 SY Full Depth Reclamation; 816 CY Shoulder Base Aggregate (LV), Class 1; 843 Gallons Bituminous Material for Tack Coat; 1,985 Tons Type SP 9.5 Wearing Course Mixture (2,C); 1,985 Tons Type SP 9.5 Non-wearing Course Mixture (2,C); 1 L.S. Traffic Control; 17,073 L.F. 4" traffic marking lines paint, among other things SAP 033-617-010 - (3.40 mi.) The project is located in Grasston MN to 3 mile west. AND, SAP 033-605-022 - (0.47 mi.) is located 1/2 mile west of Grasston MN - The combined work consists of Bituminous Overlay, Bituminous Surfacing, Full Depth Reclamation, Milling Bituminous, Aggregate Shouldering, signing, and Striping, among other things. The major quantities of work are: 1 L.S. Mobilization; 1 L.S. Maintenance and Restoration of Haul Roads; 30,092 SY Full Depth Reclamation; 65,813 SY Mill Bituminous Surface (2") 1,028 CY Shoulder Base Aggregate (LV), Class 1; 4,031 Gallons Bituminous Material for Tack Coat; 4,259 Tons Type SP 9.5 Wearing Course Mixture (2, B); 3,388 Tons Type SP 9.5 Wearing Course Mixture (2, C); 3,388 Tons Type SP 12.5 Non-Wearing Course Mixture (2, C); 27 Each Mailbox Support; 1 L.S. Traffic Control; 71,716 L.F. 4" traffic marking lines paint, 504 SF Sign panels Type C and D; among other things KCP 22-04 - 5.87 miles of Tight blade leveling and Bituminous overlay with Aggregate shouldering, on County Road 48, 5 miles south of Ogilvie Mn. The major quantities of work are: 1,320 CY of Shoulder Base Aggregate Class 1; 8,975 Tons Type 9.5 Wearing Course Bituminous Mixture (2, B); 1,089 Tons Type 4.5 Non-wearing course Bituminous Mixture (2, B) (3/4" lift of paver laid tight blade leveling); 45 Each Mailbox Support; 121,719 LF of 4" Solid line striping; 1 L.S. Traffic Control, 504 SF Sign panels Type C and D; among other things Arthur Township Project 22-01 - 0.52 miles of Bituminous surfacing over aggregate base, 1 mile south of Mora MN. The major quantity is 1,350 Tons of Type 9.5 Wearing Course Bituminous mixture (2,C) AND 0.51 miles of Bituminous overlay, 2.6 mile southwest of Mora MN. The major quantity is 828 Tons of Type 9.5 Wearing Course Bituminous mixture (2,B) Working Days will begin July 11, 2022. Construction operations shall not commence prior to Contract Approval. COMPLETION DATE: 40 Working Days
Award
Roads / Highways
$3,368,111.00
Public - County
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2022
July 15, 2022
Multiple Locations, Mora, MN
Related To This Project
Mora, MN
Bid Date: Jul 28 2022
Mora, MN
Bid Date: Sep 15 2022
Mora, MN
Bid Date: Jan 24 2023
Mora, MN
Bid Date: Apr 13 2021
Mora, MN
Bid Date: Jan 23 2023
Mora, MN
Bid Date: Jan 23 2023
Mora, MN
--
Mora, MN
Bid Date: Apr 11 2023
Mora, MN
Bid Date: Apr 18 2022
Mora, MN
Bid Date: Apr 18 2022
Mora, MN
Bid Date: Mar 24 2022
Mora, MN
Bid Date: Dec 16 2022
Mora, MN
Bid Date: Dec 08 2022
Mora, MN
Bid Date: Mar 25 2022
Mora, MN
Bid Date: Oct 07 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.