Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 25, 2023 at 7:00 PM
Updated January 25, 2024
Site work for a water / sewer project in Atlanta, Georgia. Completed plans call for site work for a water / sewer project.
As of January 24, 2023, the project has not been awarded. A timeline for award has not been established. City of Atlanta - Raw Water Transmission Main Renewal Project A- The Work of this Contract is shown on the Drawings and may consist of all or some of the following: 1. Cleaning and renewal of approximately 2,242 LF of existing 36-inch diameter cast iron pipe that is currently out of service. In order to create access to the pipe interior, six (6) temporary access pits will be excavated and the pipe will be cut open in those locations to allow for the removal and subsequent replacement of the original spool pieces. Upon completion of pipeline cleaning and renewal, the excavations will be backfilled and the ground or pavement restored. 2. Pre-cleaning, post-cleaning and Post-Renewal Closed Circuit Television (CCTV) inspection of the cast iron pipeline to be renewed. 3. Pipeline mechanical work including: interior pipe repair at one (1) location on the 36-inch cast iron pipeline, installation of cathodic protection on the 36-inch ductile iron pipe, the replacement of one (1) blowoff valve on the 36- inch pipeline. 4. Temporary and permanent erosion and sedimentation control on all land disturbance. 5. Extra work (if ordered by the City of Atlanta) may include: Additive Alternate 1, additional pipeline renewal not included in the scope above, pipeline repair, valve replacement, cathodic protection installation, or small diameter pipeline work. 6. All associated miscellaneous work, including site restoration, pavement replacement, debris disposal, and cleanup. B. The Contractor shall furnish and install all labor, materials, equipment and incidentals which are reasonable and properly inferable and necessary for the proper completion of the Work, whether specifically indicated in the Contract Documents or not. C. The Contractor shall perform the Work complete, in place and ready for continuous service and shall include repairs, replacements and restoration required as a result of all damages that occur as a result of construction under this Contract.
Bid Results
Water / Sewer
$8,910,457.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 7, 2022
October 7, 2022
Multiple Locations, Atlanta, GA
Related To This Project
Atlanta, GA
--
Atlanta, GA
Bid Date: Apr 21 2022
Atlanta, GA
Bid Date: Jan 27 2022
Atlanta, GA
Bid Date: Dec 08 2022
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
Bid Date: Feb 09 2023
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
--
Atlanta, GA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
