BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Atlanta, Georgia. Completed plans call for site work for a water / sewer project.

As of January 24, 2023, the project has not been awarded. A timeline for award has not been established. City of Atlanta - Raw Water Transmission Main Renewal Project A- The Work of this Contract is shown on the Drawings and may consist of all or some of the following: 1. Cleaning and renewal of approximately 2,242 LF of existing 36-inch diameter cast iron pipe that is currently out of service. In order to create access to the pipe interior, six (6) temporary access pits will be excavated and the pipe will be cut open in those locations to allow for the removal and subsequent replacement of the original spool pieces. Upon completion of pipeline cleaning and renewal, the excavations will be backfilled and the ground or pavement restored. 2. Pre-cleaning, post-cleaning and Post-Renewal Closed Circuit Television (CCTV) inspection of the cast iron pipeline to be renewed. 3. Pipeline mechanical work including: interior pipe repair at one (1) location on the 36-inch cast iron pipeline, installation of cathodic protection on the 36-inch ductile iron pipe, the replacement of one (1) blowoff valve on the 36- inch pipeline. 4. Temporary and permanent erosion and sedimentation control on all land disturbance. 5. Extra work (if ordered by the City of Atlanta) may include: Additive Alternate 1, additional pipeline renewal not included in the scope above, pipeline repair, valve replacement, cathodic protection installation, or small diameter pipeline work. 6. All associated miscellaneous work, including site restoration, pavement replacement, debris disposal, and cleanup. B. The Contractor shall furnish and install all labor, materials, equipment and incidentals which are reasonable and properly inferable and necessary for the proper completion of the Work, whether specifically indicated in the Contract Documents or not. C. The Contractor shall perform the Work complete, in place and ready for continuous service and shall include repairs, replacements and restoration required as a result of all damages that occur as a result of construction under this Contract.

Bid Results

Water / Sewer

$8,910,457.00

Public - City

Site Work

3

47

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
51
Bidding Soon
1,497
All Active Projects
565
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.